PermitDig
single_family_(detached)Issued

New Master Plan Blandford Homes #4503 – Encanto. 3615 S.F livable, 1208 S.F. non-livable. Two story with a 2 car garage. Elevation options A, B, F, G, H, I, and J. Options second flr at elev. B and J +95 S.F. non-livable pop outs and balcony. Options for a 2 ft and 4 ft ext at garage. Option for a smaller loft -75 S.F livable. Options on floorplan are Den or Bedroom 7 at dining. Den at bedroom 6. Other options of Fireplace, Walk-in-Shower, enlarged bedroom 2 and 5, bedroom 2 at loft, and multi

3101 E ELMWOOD ST, Mesa, AZ

Permit Details

Permit Number
PMT25-23465
Type
single_family_(detached)
Status
issued
Issued Date
December 11, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
RESERVE 100 LLC

About single_family_(detached) Permits in AZ

0

single_family_(detached) permits in AZ

Other Permits in Mesa, AZ

Hawes Crossing Village 4 is a part of the Hawes Crossing master planned community located northeast quarter of Section 20, Township 1 South, Range 7 East of the Gila and Salt River Meridian. The Project is comprised of approximately 39 net acres planned for single family residential development. Approved with comments. Landscape meter included in Phase 1 under PMT25-03485.

8235 E WARNER RD · PMT26-10351

Install one Non Illuminated Monument Sign PECOS CROSSING. 42.50 sq ft.

7021 S SOSSAMAN RD · PMT26-09619

INSTALLATION OF 12-FT11-IN OF 1.2-IN PE GAS LINE BURIED 18-IN WITH 18 GAUGE TRACER WIRE FROM EXISTING 3.4-IN GAS STUB TO 38K BTU GRIDDLE & 8-FT OF1.2-IN PE GAS LINE TO 31K BTU GRILL. ALL GAS LINES TO BE INSTALLED PER 2024 IFGC & SW GAS REQUIREMENTS. SW GAS TO DETERMINE IF THE METER NEEDS TO BE UPGRADED.

5448 S BOCA · PMT26-10730

Group M occupancy. Type II-B construction. 3,000 SF. Occupant load 42. Demo marked portion of demising wall to give space to adjacent suite. Demo storefront system, storefront column, partition walls, plumbing fixtures, floor drains, electrical panel, portion of slab for electrical trenching, soffit and columns, existing RTUs, mechanical ducting, electrical lighting, and ceiling. New 1-hr rated demising wall at storage area. New partition walls to create storage area, ADA compliant restroom, and

1854 S VAL VISTA DR 103 · PMT26-07960

INSTALLATION OF 12.1-FT X 34.1-FT 2026 CAVCO TUSCANY PARK MODEL WITH AC IN REAR. VIN NO. CFPUS3440T1211389. NO GAS OR LP TANKS. NO AWNING. NO OTHER ACCESSORY STRUCTURES AT THIS TIME. MINIMUM ONE 9-FT X 18-FT UNOBSTRUCTED PAVED PARKING REQUIRED BEHIND FRONT SETBACK ON 2-IN ASPHALT OR 4-IN CONCRETE. 33-FT X 48-FT INTERIOR LOT. MINIMUM SETBACKS ARE 5-FT MIN MEASURED FROM EDGE OF ASPHALT, 3-FT REAR FOR INTERIOR LOTS, 18-IN SIDES FOR LOTS LESS THAN 35-FT WIDE. APPROVED AS NOTED.

4860 E MAIN ST J20 · PMT26-08785

About single_family_(detached) Permits in Mesa, AZ

What is a single_family_(detached) permit?

A single_family_(detached) permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.