PermitDig
ElectricalC of c issued

This permit is to upgrade to a 225A MAIN PANEL SERVICE with installation of ONE TESLA POWERWALL 3 BATTERY. Installation shall comply with City of Mesa codes and servicing electric utility requirements. Do not disconnect utility wires or meters. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit. Failure to schedule disconnect may result in additional utility trip charge fees and charges for any damage to distribution equipment. S

2358 E CABALLERO ST, Mesa, AZ

Permit Details

Permit Number
PMT25-22553
Type
Electrical
Status
c of c issued
Issued Date
January 15, 2026
County
Mesa, AZ
View on county site

Parties

Contractor
Hannah Raymundo

About Electrical Permits in AZ

0

Electrical permits in AZ

About Electrical Permits in Mesa, AZ

What is a Electrical permit?

A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.