PermitDig
ElectricalC of c issued

THIS PERMIT IS FOR A NEW 200A ELECTRIC SERVICE PANEL UPGRADE WITH A 225A MAX. BUS RATING AND FOR THE INSTALLATION OF TWO (2) TESLA POWERWALL 3 BATTERIES @ 13.5kWh AND ASSOCIATED HARWARE. ENERGY BACK UP SYSTEM TO BE INSTALLED PER MANUFACTURE INSTALLATION SPECIFICATIONS AND PER IRC 2018 SECTION R327. PERMIT DOES NOT INCLUDE PV SOLAR SYSTEM INSTALLATION.

4208 E EDGEWOOD AVE, Mesa, AZ

Permit Details

Permit Number
PMT25-15838
Type
Electrical
Status
c of c issued
Issued Date
October 7, 2025
County
Mesa, AZ
View on county site

Parties

Contractor
Hannah Raymundo

About Electrical Permits in AZ

0

Electrical permits in AZ

About Electrical Permits in Mesa, AZ

What is a Electrical permit?

A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.