PermitDig
ElectricalC of c issued

PERMIT IS FOR INSTALLATION OF ONE TESLA POWERWALL3 + ONE POWERWALL EXPANSION BATTERY. INSTALLATION OF A 60 AMP CIRCUIT BREAKER FOR A TESLA UNIVERSAL WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2017 NEC AND SRP STANDARDS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN

932 S 78TH PL, Mesa, AZ

Permit Details

Permit Number
PMT25-12161
Type
Electrical
Status
c of c issued
Issued Date
July 31, 2025
County
Mesa, AZ
View on county site

Parties

Contractor
Tesla

About Electrical Permits in AZ

0

Electrical permits in AZ

About Electrical Permits in Mesa, AZ

What is a Electrical permit?

A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.

How long does this permit remain valid?

Permit validity varies by jurisdiction. In Mesa, AZ, permits typically remain valid for 6-12 months from the issue date. Contact the local building department for specifics.

Where does this data come from?

This permit record comes from Mesa, AZ's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.