Electrical
341 Beacon ST, Boston, MA 02116
$2,000
Estimated Value
Permit Details
- Permit Number
- E1901944
- Type
- Electrical
- Status
- closed
- Issued Date
- September 22, 2026
- Expires
- March 22, 2027
- County
- Boston, MA
Parties
No contractor listed
About Electrical Permits in MA
4,003
Electrical permits in MA
$104,613
Average estimated value
Other Permits in Boston, MA
Similar Electrical Permits
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F
Mesa, AZ · PMT26-13755
169-FT OF 1-IN ELECTRICAL RUN FOR PORTABLE SPA AND 113-FT OF .50-IN TO THREE PERGOLA CAN LIGHTS. ONE LIGHT SWITCH AND 60AMP GFCI OUTLET WITH TWO BUBBLE COVER. PERGOLA UNDER SEPARATE PERMIT PMT26-15875.ELECTRICAL TO BE INSTALLED PER 2023 NEC REQUIREMENTS
Mesa, AZ · PMT26-16299
Replacing existing electric 200A main service panel and upgrading to a new 400A main panel. Minimum required building inspections: Electric rough in and electric final.
Mesa, AZ · PMT26-17406
install mini split with 20A circuit breaker
Mesa, AZ · PMT26-17579
Install of a new 50A electric sub-panel to an existing shed. Minimum required building inspections: Electric rough in and electric final.
Mesa, AZ · PMT26-18202
About Electrical Permits in Boston, MA
What is a Electrical permit?
A Electrical permit authorizes specific construction or renovation work at a property. It ensures the work meets local building codes and safety standards. Most jurisdictions require permits for structural changes, electrical work, plumbing, roofing, and demolition.
How long does this permit remain valid?
This permit expires on March 22, 2027.
Where does this data come from?
This permit record comes from Boston, MA's public records, sourced via their open data portal. All building permit data in the US is public record. PermitDig aggregates this data to make it searchable.