Search Permits
11,812 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 Ton Two Stage Vertical Gas
Install 18000 BTU Mini Split in Garage
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1.1005
New single-story SFR with attached garage covered patio and covered porch *PRODUCTION BUILDER- GREEN BUILDING*
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
NEW 2 STORY SINGLE-FAMILY RESIDENCE ATTACHED GARAGE COVERED PORCH AND PATIO 4/3
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 465
2050 SF of Level 2 Interior renovations to create suite 230 for medical office use A C.O. Is requested for this suite.
Replacement of complete existing central heat and air system with or without duct work
San Luis 1512-J-R New 2-Story Single Family Residence with (4) bedrooms (3) bathrooms Attached Garage Covered Patio & Porch Cafe & Game Room
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work 1 system: 4 TON 14 SEER2 STRAIGHT COOL
mechanical
mechanical
Use of temporary knuckle boom construction equipment as per plans filed herewith,
INSTALLATION OF TEMPORARY CHUTE AS PER PLANS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
REPLACEMENT OF SPLIT HVAC SYSTEM ON FLOOR 001 AND THE ROOF WITH A TOTAL CAPACITY OF 26..5 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
Install HVAC units in conjunction of NB B01128862.
INSTALLATION OF 6000 LB SINGLE PERSONNEL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation Of Temporary Dual Personnel Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Legalize existing HVAC unit on roof to obtain Certificate of Compliance and resolve FDNY violation
Application filed to propose HVAC installation. No change to use, occupancy, or egress.
INSTALLATION OF NEW AC UNITS AND DUCTWORK. NO CHANGE IN USE, EGRESS, USE OR OCCUPANCY.
Filing to install the deli kitchen exhaust system, hood and ductwork as per plans.