Search Permits
16,855 results · type: electrical
PERMIT IS ONLY FOR INSTALLATION OF ONE SOLAR EDGE BATTERY. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND CHAR
electrical
electrical
electrical
electrical
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Relocating of a 120v electrical outlet
Interior finish out for suite 380 demised under 2026-057381 PR and 2026-062627 BP. No work was done in 380 besides the demising wall under previous permit. It was left in a shell state. No access control scope included.
ePlan: Residential Expedited Review - New construction of a 2 story single family residence with third floor habitable attic 6 bedroom 4.5 bathroom covered porch & uncovered deck.
temporary tpole for new construction in Wildhorse Ref: 2026-105212-BP
homebuilder loop refer to 2026 - 102423 BP
7198 SF tenant remodel for Action Behavior Center
Complete service rebuild. Like for like.
BLAST SWIM ACADEMY FRONT STORE CHANNEL LETTER SIGN
Exterior Facade Upgrade Of The Existing Hyundai Showroom And Service Building. Scope Of Work Includes Interior Renovations To Both Buildings And The Addition Of A Small Canopy At The Back Of The Showroom. No Major Site Demolition Or Construction Is Included In This Project.
Replacing main panel
125amp to 200amp main panel and service replacement. Austin Energy is the electrical provider.
200 amp panel 200 amp meter base overhead riser and grounding
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [4bed 3.5bath] with Attached Carport. Unit 1A
New Construction single-family residential 1-story 3 bedroom 2 bath with covered front porch and covered rear patio.
New elevated pool/spa with required enclosure (heater or autofill)
PB: New construction of 2 story SFR condo attached 1 car garage rear covered patio
Homebuilder Loop Austin 2 Mile ETJ Austin Energy
New 3-story 3 bedroom 3.5 bathroom single family residence with attached carport covered front porch rear covered patio rear trellis and 2nd floor partially covered balcony.
Emergency repair for downed line. Moving meter to proper location and adding main disconnect proper ground and riser. Old cloth riser was damaged when tree fell.
Wilson - 40-06206 - Disconnect/reconnect power to tie in PV component and upgrading MSP to 200 Amps. 200 amp Main Breaker. Upgrading revenue meter to 200 Amps. Underground service requesting wire pull.
Install Level 2 EV Charger
QT - INTERIOR FINISH OUT OF OFFICE SPACE - OVA
Homebuilder Loop Austin 2 Mile ETJ Austin Energy