INSTALLATION OF SINGLE PERSONNEL/MATERIAL HOISTS. CARS#1 SHALL BE 6000# CAPACITY DURING NEW BUILDING CONST FILED SEP. HOISTS SHALL COMPLY WITH THE 2022 BLDG CODES, CH #33. NO CHANGE IN USE, OCC OR EGRESS UNDER THIS APP ELEV APPL FILED SEP
Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY CHUTE AS PER PLANS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.
TEMPORARY ROOF ENCLOSURE AS PER DRAWINGS. ROOF ENCLOSURE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
IT IS PROPOSED TO INSTALL MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK AS SHOWN ON PLANS. APPLICATION FILED IN CONJUNCTION W/M01309486-I1(GC), M01309486-S2 (PL/SP).
INSTALL NEW GAS-FIRED UNIT HEATERS AS PER PLANS. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
FILING FOR REMOVAL OF (3) AC UNITS AND INSTALLATION OF (3) FCUS AND ASSOCIATED DUCTS AND PIPING AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Modifications to existing HVAC System: Remove, relocate and reinstall exiting ductwork and infrastructure to accommodate interior renovations on the Cellar and 1st Floor as per plans (Hines Storefront Phase 2.) No change in use, egress or occupancy.
Modification to existing Mechanical systems as per plans filed herewith; Replacement of five (5) fluid coolers on the 15th floor & Provisions for portable A/C units on the 10th Floor.
Installation of 5 split system condensing units & air handlers and new radiators. No change of use, occupancy or egress.
Alt. MS file in conjunction with the alt gc application. Removal of the existing HVAC system.
Filing this MECH application in conjunction with ALt-1 application # Q01271738-I1 for all new HVAC units, no change of use, egress or OCcupancy
Mechanical work for BMO on 33rd marketing floor (32nd construction floor)
Mechanical work as shown on plans in conjunction with GC filing. Work to include installation of new equipment and ducts.
EXPRESS: Insulate garage walls & ceiling and install sheetrock.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work 4 TON CONDENSER CHANGE-OUT INCLUDING INDOOR COIL & 88K BTUS FURNACE CHANGE-OUT
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
ePlan: Residential Expedited Review - New Two Units: Bldg 2 New Construction of 2-Story Single Family Res.[3bed 2.5bath] with attached carport
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
188 SF of Level 2 Interior renovations to create new suite 210 for medical office use A C.O. Is requested for this suite.
883 SF of Level 2 Interior renovations to create new suite 200 for medical office use A C.O. Is requested for this suite.
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
Replacement of complete existing central heat and air system with or without duct work
REBUILD AFTER FIRE. WILL REPLACE DAMAGED FRAME DRYWALL INSULATION FLOORING AND PAINT WALLS. (Suite A - Floor 1)
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 12 K BTU Ductless