Search Permits
16,855 results · type: electrical
ePlan: Commercial Expedited Review - New Carport (486 SF)
New Construction SFR Electrical 2206 sq. ft. ETJ
Level 2 EV Charger installation
ePlan: Commercial Expedited Review - New Garage (1566 SF)
Tpole for construction
New detached garage/carport
ePlan: Commercial Expedited Review - New Garage (1566 SF)
Interior remodel of existing office suite to demise new office suite 200 with associated MEP scope. No access control. (Building 2 Unit 200)
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport. Bldg 2
New inground swimming pool.
Interior remodel to existing admin office Suite 400 to create newly demised Suite 450 and a new corridor. Scope of work for this permit is only suite 450.
New 2nd story addition to existing single residence.
ePlan: Commercial Expedited Review - New Garage (1566 SF)
Interior remodel of existing office suite to demise new office suite 220 with associated MEP scope. No access control. (Building 2 Unit 220)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(r)
PERMIT TO UPGRADE TO A 225A SERVICE PANEL AND INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOP
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
INSTALLATION OF A NEW 240 VOLT 50 AMP DEDICATED CIRCUIT BREAKER FOR CHARGE POINT HOME FLEX EV CHARGER IN THE GARAGE. EXISTING 200 AMP SERVICE METER. CHARGE-POINT STATION SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND THE ELECTRICAL SHALL COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
replace like for like 200a panel, no new circuits, no relocation
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F
Meter panel to be located within the front 3' of the house not to be fenced or enclosed. Customer to provide and maintain a clear and level 3'6" x 3'6" workspace. Meter panel must remain readily accessible to SRP at all times
Change old electrical panel from 200 amps to 200 amps for more spacing in the same location.