Search Permits
7,149 results · type: mechanical
Bevolution Project Remove and Replace existing tea and fountain equipment and chiller. Existing C02 to remain. There are no modification to exterior walls parking sidewalks or landscape.
Replacement of complete existing central heat and air system with or without duct work
RESIDENTIAL
RESIDENTIAL
We will supply and install a 18kW Air Cooled Generac generator. The generator will be placed on the left hand side of the house on a 36" aluminum stand. We will remove the existing meter/panel combo and replace it with a separate meter socket and panel. We will supply and install a 200amp Automatic Transfer Switch (ATS). An appropriately sized gas line will be installed, including any required utility upgrades or modifications.
Installation of six HVAC systems, including two 15-ton units, one 6-ton unit, and three 5-ton units with associated air handlers, ductwork, refrigerant piping, ventilation, and controls for a new construction church.
remove & replace (1) 2 ton gas furnace with 24k btu and (1) 2 ton evaporator coil
Replace 2.5 ton condenser, furnace and evap coil
Replace 4 ton condenser and air handler
Replace 4 ton condenser, furnace and evap coil.
Replace 4 ton condenser, furnace and evap coil.
Replace 5 ton condenser, furnace and evap coil
Repair a gas leak, and pressure test.
Install gas line for pool heater
Provide and Install New Kitchen Hood including associated Ductwork 2nd floor
Testing of an existing natural gas line to re-establish metered service. 6 month vacancy
mechanical
mechanical
mechanical
mechanical
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Replacement of air conditioning units. No change in use egress and occupancy.
interior mechanical 11th floor
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
Installation of 7,000# temporary single car personnel hoist per plan and application submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
TEMPORARY ROOF PROTECTION AT THE ADJOINING PROPERTIES AS PER DRAWINGS. ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modification to existing HVAC systems as per plans filed herewith.