Search Permits
11,812 results · type: mechanical
INSTALLATION OF TEMPORARY PROTECTION WINDOW AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
ALTERATION TO EXISTING COMMERICAL KITCHEN EXHAUST PER JUICI PATTIES FIT OUT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
FILING OF HVAC UNITS TO OBTAIN CERTIFICATE OF COMPLIANCES. FILING TO ADDRESS FDNY VIOLATION# 014261409R
TBD
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
DIRECT REPLACEMENT OF HVAC ROOF TOP UNIT
MECHANICAL WORK ONLY TO REMOVE EXISTING FRIEDRICH UNIT AND TO INSTALL NEW ELECTRIC SPLIT AC SYSTEMAT EXISTING BASEMENT & CONDENSER AT LOW ROOF.
REPLACEMENT OF OUTDOOR YORK ROOFTOP UNIT (UNIT 7) ON SOUTHEAST CORNER OF THE ROOF. NO CHANGE TO OCCUPANCY, USE OR EGRESS.
Demo modification to Mechanical Systems as per plans filed herewith
Modifications to existing HVAC system and related ductwork / piping. No change in use, egress or occupancy.
MECHANICAL APPLICATION FILED HEREWITH IN CONJUNCTION TO NB APPLICATION B08004889-I1
NYP Farrell: Modification HVAC equipment and ductwork to accommodate alterations within the existing medical office as per plans.
INTERIOR RENOVATION OF EXISTING TWO STORY HOUSE. NO CHANGE IN USE, OCCUPANCY OR EGRESS
Chimney upgrade. No change in use, egress or occupancy.
MECHANICAL WORK IN AN EXISTING COMMERCIAL SPACE ON THE 17TH FLOOR (FISHKIN LUCKS)
RENOVATION OF EXIST. COMMERCIAL SPACE WITH, REPAIR/REPLACE/NEW PARTITION, FLOOR, CEILING, DOOR, WALL, STOREFRONT, PAINTING, ALSO INSTALL SPLIT TYPE A/C AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
STORE RENOVATION (ZARA) WORK TO INCLUDE MECHANICAL MODIFICATIONS AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
NEW HVAC SYSTEM AS SHOWN IN DRAWINGS
*Partial Demo* Interior remodel Revision to add Mechanical Permit approved 8/11
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1609
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1318
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work BAJWA
Replacement of complete existing central heat and air system with or without duct work Belinda Wilson
Replacement of complete existing central heat and air system with or without duct work like for like 2t horz