Search Permits
189,817 results
Plumbing for New Build SF
Pluming Remodel of existing residential property
Interior Remodel of 2nd and 3rd floor- Elevator Lobbies for Building F
ePlan: Expedited Review - Finish-Out For Multi-Family Units (18357 SF)
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [1bed 1bath] with attached Garage. Unit B
Structural support of plywood decking in unit 250 access from unit 150. Installation of 3/4 plywood reinforcement strips between existing floor joists sistered to existing framing members to reinforce the subfloor structure.
Replacement of roof
Express- Interior exploratory demolition prior to full interior remodel
ePlan: Expedited Review - Finish-Out For Multi-Family Units (18296 SF)
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [3bed 3.5bath] with Autofill Pool. Unit A
Total demo of pool/spa/deck 2052 sq ft circa 1978
Replacing yard water line from meter to house due to large leak. Emergency due to size of leak and homeowner has no water .
Homebuilders loop for New SFR ref 2026-052291 BP. Austin LTD -PEC
Update the electrical meter and panel
Upgrading the customers riser meter and panel
Stand alone service rack for meters and main disconnects for (3) units on property.
replacement of roof building 8523 - OVA
Addition and remodel to existing 1-story single-family residential to include: living room and primary suite expansion; new covered front porch covered rear patio and attached 2-car garage; full interior remodel of existing space.
Total demolition of existing 2723 sqft wood-framed restaurant circa 1973. The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.
New pool and spa
Replacement of an existing water heater replace ng water heater
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Habitable Attic and Attached Garage.
ePlan: Expedited Review - Finish-Out For Multi-Family Units (18296 SF)
Sewer line replacement from house to city tap approx 40
Replace roof shingles with new shingles and replace fascia and any bad decking as needed.
Tesla proposing to add EV charging to existing parking. Includes the installation of 3 PSU which include 3 cabinets 24 charging posts 6 luminaires 1 Tesla site controller 1 switchboard assembly 1 utility transformer 1 meter 1 primary metering cabinet
Replacement of an existing water heater replaced ng water heater
Addition/remodel. Addition of a screened patio to rear of existing 2-story single family residence. Addition of nooks in 2nd floor bedrooms (within existing roofline). Comprehensive interior remodel including bathrooms and kitchen. Refinish exterior surface. Install new AC units.
**TPOLE REF BP # 2026-057121