Customer needs wiring upgraded to handle 200A replace wiring from load side of meter to main breaker to 2/0 copper and also neutral wire to 2/0 copper. This customer is a part of the base program.
BASE: Installing a backup battery system and additional meter socket.
Outdoor installation of (1) weatherproof nema 14-50 and (1) 40 amp gfci breaker outdoor by the main panel..
7 DAY - 2 applications. Suite 415 and 420. 420:INTERIOR ALTERATION OF APPROX. (2310SF) OF EXISTING INTERIOR OFFICE SPACE. 415:INTERIOR ALTERATION OF APPROX. (2660SF) OF EXISTING INTERIOR OFFICE SPACE. - OVA
Brahman 3318 A Left New - 2 Story SFR CONDOMINUM w/ 4 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.58 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 28-10 Actual Bld height: 28-10 required parking: 2.
BASE: Installing a backup battery system and additional meter socket.
Remove and replace existing tea and fountain equipment and chiller. Existing CO2 to remain. There are no modifications to exterior walls parking sidewalks or landscape.
Stanton - 39-96789 - Install new 5.7 kW rooftop solar system to existing residential only using backfed breaker only.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Build 120/240v 1ph 200-amp overhead electrical service on rack on left corner of backyard. Run 2 PVC underground to feed existing house.
*Green Building* New 1-story 3 bedroom 2 bathroom single family residence with attached garage covered front porch and rear covered patio.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Service Upgrade 200 Amp
Install Level 2 EV Charger
7 DAY - 2 applications. Suite 415 and 420. 420:INTERIOR ALTERATION OF APPROX. (2310SF) OF EXISTING INTERIOR OFFICE SPACE. 415:INTERIOR ALTERATION OF APPROX. (2660SF) OF EXISTING INTERIOR OFFICE SPACE. - OVA
Dexter 3317 C Right New - 2 Story SFR CONDOMINUM w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio FFE: 683.53 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 30 Actual Bld height: 30-0 required parking: 2.
electrical_permit_(r)
electrical_permit_(r)
Installation of 20-amp circuit breaker at Main Electric Panel for three exterior GFCI receptacles for BBQ area. Electrical to comply with 2023 NEC requirements and SRP standards. This permit does not include any accessory structures. Light gauge, pre-manufactured metal patio covers and awnings are exempt from building permit but not from zoning ordinance requirements. Maintain a min of 2-ft from overhang to the property lines to comply.
PERMIT IS ONLY FOR INSTALLATION OF TWO TESLA POWERWALL 3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Residential Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
PERMIT IS ONLY FOR UPGRADE TO A 225A SERVICE AND INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF