PermitDig

Search Permits

2,737 results · type: residential

New detached 1,766 SF single-family residence within a 29 unit multi-family project. Unit 128 - Plan 4. Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 128, Mesa
Nov 13

New detached 1,766 SF single-family residence within a 29 unit multi-family project. Unit 101 (Plan 4). Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 101, Mesa
Nov 13

New detached 1,819 SF single-family residence within a 29-unit multi-family project. Unit 104 (Plan 3). Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 104, Mesa
Nov 13

New 4,423 SF multi-family tri-plex building within a 29-unit multi-family project. Includes units 112, 113 & 114. Group R-2 Occupancy and Type V-B Construction. No Civil Plans or Design Reports included with this submittal. No civil reviews completed under this permit. Civil plan review is under PMT24-13087. Deferred fire sprinklers, fire alarm, access control. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistan

144 S 90TH ST 112, Mesa
Nov 13

New detached 1,766 SF single-family residence within a 29 unit multi-family project. Unit 107 - Plan 4. Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 107, Mesa
Nov 13

New detached 1,766 SF single-family residence within a 29-unit multi-family project. Unit 105 - Plan 4. Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 105, Mesa
Nov 13

New detached 1,819 SF single-family residence within a 29 unit multi-family project. Unit 129 - Plan 3. Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 129, Mesa
Nov 13

New 5,960 SF multi-family quad-plex building within a 29-unit multi-family project. Includes units 123, 124, 125 & 126. Group R-2 Occupancy and Type V-B Construction. No Civil Plans or Design Reports included with this submittal. No civil reviews completed under this permit. Civil plan review is under PMT24-13087. Deferred fire sprinklers, fire alarm, access control. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Re

144 S 90TH ST 123, Mesa
Nov 13

New 4,423 SF multi-family tri-plex building within a 29-unit multi-family project. Includes units 109, 110 & 111. Group R-2 Occupancy and Type V-B Construction. No Civil Plans or Design Reports included with this submittal. No civil reviews completed under this permit. Civil plan review is under PMT24-13087. Deferred fire sprinklers, fire alarm, access control. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistan

144 S 90TH ST 109, Mesa
Nov 13

New detached 1,766 SF single-family residence within a 29-unit multi-family project. Unit 103 (Plan 4). Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 103, Mesa
Nov 13

New detached 1,819 SF single-family residence within a 29 unit multi-family project. Unit 108 - Plan 3. Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 108, Mesa
Nov 13

New 5,960 SF multi-family quad-plex building within a 29-unit multi-family project. Includes units 119, 120, 121 & 122. Group R-2 Occupancy and Type V-B Construction. No Civil Plans or Design Reports included with this submittal. No civil reviews completed under this permit. Civil plan review is under PMT24-13087. Deferred fire sprinklers, fire alarm, access control. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Re

144 S 90TH ST 119, Mesa
Nov 13

New detached 1,830 SF single-family residence within a 29-unit multi-family project. Unit 102 (Plan 5). Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 102, Mesa
Nov 13

New detached 1,819 SF single-family residence within a 29 unit multi-family project. Unit 127 - Plan 3. Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 127, Mesa
Nov 13

New detached 1,819 SF single-family residence within a 29 unit multi-family project. Unit 106 - Plan 3. Group R-2 occupancy and type V-B construction. Includes a new 200A, 1-phase electric service panel/meter. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Resistant Materials, Fire-resistant penetrations & joints and Pre-manufactured shear wall installation including foundations and anchorage.

144 S 90TH ST 106, Mesa
Nov 13

New 5,960 SF multi-family quad-plex building within a 29-unit multi-family project. Includes units 115, 116, 117 & 118. Group R-2 Occupancy and Type V-B Construction. No Civil Plans or Design Reports included with this submittal. No civil reviews completed under this permit. Civil plan review is under PMT24-13087. Deferred fire sprinklers, fire alarm, access control. Special Inspections Required for Post-installed anchorage into concrete (if occurs), Concrete Construction, Soils, Sprayed Fire-Re

144 S 90TH ST 115, Mesa
Nov 13

BUILDING 5 NAVONA APARTMENT LIVING-NEW MULTI-FAMILY DEVELOPMENT CONSISTING OF 400 APARTMENT UNITS WITHIN A TOTAL OF 11 BUILDING TYPES IN 2-STORY AND 3-STORY CONFIGURATIONS. ONE MAIN CLUBHOUSE AND LEASING BUILDING TO SUPPORT OVERALL PROJECT. SEE PMT22-21187 FOR THE CIVIL WORK AND WATER METERS. DEFERRED FIRE ALARM. DEFERRED 13 NFPA FIRE SPRINKLERS/STANDPIPE. DEFERRED ELEVATORS. VEHICLE ACCESS GATES. BLD 5

10141 E WILLIAMS FIELD RD, Mesa
Nov 6

BLDG 11 - New 248 dwelling apartment complex composing of (12) two and three stories multi-family buildings, (1) clubhouse/leasing building with pool, (14) five-bay garages. VB construction. R-2 & A-3 Occupancy. Deferred fire sprinklers and fire alarms. Related to Civil improvements under PMT24-01715. New 4" domestic water meter. Under separate permits: pool, carport, signage, access control.

1340 S 48TH ST, Mesa
Nov 6

BLD 6 NAVONA APARTMENT LIVING - NEW MULTI-FAMILY DEVELOPMENT CONSISTING OF 400 APARTMENT UNITS WITHIN A TOTAL OF 11 BUILDING TYPES IN 2-STORY AND 3-STORY CONFIGURATIONS. ONE MAIN CLUBHOUSE AND LEASING BUILDING TO SUPPORT OVERALL PROJECT. SEE PMT22-21187 FOR THE CIVIL WORK AND WATER METERS. DEFERRED FIRE ALARM. DEFERRED 13 NFPA FIRE SPRINKLERS/STANDPIPE. DEFERRED ELEVATORS. VEHICLE ACCESS GATES. BLD 6 -

10141 E WILLIAMS FIELD RD, Mesa
Oct 22

New development of a 3-story, 267,266 SF gross, type VA construction, R2 occupancy, 222 unit multi-family building with 2,479 SF assembly and 3,465 SF business areas. Facility divided into two buildings with 2-hour fire wall, development to include a 406 SF, type VB construction U occupancy maintenance building on site.2261 E Mcdowell Rd LD1 is the address for the landscape meter on this case. Special inspection req. - steel fabricators, steel, concrete, masonry, wood, soils, fire-resistant pene

2261 E MCDOWELL RD, Mesa
Oct 14

Building 3 - 6,820 SF - New housing development for a 21-lot subdivision. Group R-2 occupancy and type V-B construction. No civil review/approval included in this permit. Civil review included on PMT23-06807. Special Inspections for: Steel, Concrete (post-tension) and Masonry Construction. Epoxy /anchor bolts, Reinforcing Steel and welding. Deferred fire sprinklers. Results in CoO.

1145 S ROWEN, Mesa
Oct 9

Building 5 - 6,820 SF - New housing development for a 21-lot subdivision. Group R-2 occupancy and type V-B construction. No civil review/approval included in this permit. Civil review included on PMT23-06807. Special Inspections for: Steel, Concrete (post-tension) and Masonry Construction. Epoxy /anchor bolts, Reinforcing Steel and welding. Deferred fire sprinklers. Results in CoO.

1145 S ROWEN, Mesa
Oct 9

Building 4 - 6,820 SF - New housing development for a 21-lot subdivision. Group R-2 occupancy and type V-B construction. No civil review/approval included in this permit. Civil review included on PMT23-06807. Special Inspections for: Steel, Concrete (post-tension) and Masonry Construction. Epoxy /anchor bolts, Reinforcing Steel and welding. Deferred fire sprinklers. Results in CoO.

1145 S ROWEN, Mesa
Oct 9

Building 2 - 6,820 SF - New housing development for a 21-lot subdivision. Group R-2 occupancy and type V-B construction. No civil review/approval included in this permit. Civil review included on PMT23-06807. Special Inspections for: Steel, Concrete (post-tension) and Masonry Construction. Epoxy /anchor bolts, Reinforcing Steel and welding. Deferred fire sprinklers. Results in CoO.

1145 S ROWEN, Mesa
Oct 9

Building 6 - 11,275 SF - New housing development for a 21-lot subdivision. Group R-2 occupancy and type V-B construction. No civil review/approval included in this permit. Civil review included on PMT23-06807. Special Inspections for: Steel, Concrete (post-tension) and Masonry Construction. Epoxy /anchor bolts, Reinforcing Steel and welding. Deferred fire sprinklers. Results in CoO.

1145 S ROWEN, Mesa
Oct 9

BLD 7 NAVONA APARTMENT LIVING - EXPEDITE-NEW MULTI-FAMILY DEVELOPMENT CONSISTING OF 400 APARTMENT UNITS WITHIN A TOTAL OF 11 BUILDING TYPES IN 2-STORY AND 3-STORY CONFIGURATIONS. ONE MAIN CLUBHOUSE AND LEASING BUILDING TO SUPPORT OVERALL PROJECT. SEE PMT22-21187 FOR THE CIVIL WORK AND WATER METERS. DEFERRED FIRE ALARM. DEFERRED 13 NFPA FIRE SPRINKLERS/STANDPIPE. DEFERRED ELEVATORS. VEHICLE ACCESS GATES. BLD 7 -

10141 E WILLIAMS FIELD RD, Mesa
Sep 26

Building 1 - 9,050 SF - New housing development for a 21-lot subdivision. Group R-2 occupancy and type V-B construction. No civil review/approval included in this permit. Civil review included on PMT23-06807. Special Inspections for: Steel, Concrete (post-tension) and Masonry Construction. Epoxy /anchor bolts, Reinforcing Steel and welding. Deferred fire sprinklers. Results in CoO.

1145 S ROWEN, Mesa
Sep 15

Civil work for a New multi-family development at the SE corner of Williams Field Road and Crismon Road. See PMT22-19389 for the buildings

10141 E WILLIAMS FIELD RD, Mesa
Sep 10

Building 4: 3-story, type V-B construction, 24,458 SF, group R-2 occupancy, 24-units. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Water meter: (1) 2-inch domestic. Deferred NFPA 13 fire sprinklers. Deferred fire alarm. EV Charger Exempt. Approved with stipulations. See stipulation on PMT25-01377B. Results in CoO. REF: PMT25-09714 A2L refrigerant code modification, REF: PMT23-17445 Offsite improvements.

515 N MESA DR, Mesa
Sep 8

Building 2: 3-story, type V-B construction, 35,163 SF, group R-2 occupancy, 36-units. Special inspection required for fabricator, steel, concrete, masonry, wood, soil, post tension slab. Water meter: (1) 2-inch domestic. Deferred fire sprinklers (NFPA 13 system). Deferred fire alarm. EV Charger Exempt. Approved with stipulations. See stipulation on PMT25-01376B. Results in CoO. REF: PMT25-09714 A2L refrigerant code modification, REF: PMT23-17445 Offsite improvements.

515 N MESA DR, Mesa
Sep 8