Search Permits
7,149 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work
Addition and remodel - Renovation of existing 1300SF home 3 bed 2 bath including new front exterior walls and all new windows addition to include extension of existing primary bedroom and new laundry off back of structure.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Galloway 3312 A Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 685.66 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2.5 Ton AC System
Replacement of furnace only
Replacement of complete existing central heat and air system with or without duct work QUINN
Replacement of complete existing central heat and air system with or without duct work HVAC Replacement
***Timed Virtual Inspection: 06/30/2026 @ 8 AM*** Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Addition to existing SFR to enclose existing rear porch and new uncovered wood deck. Reduction of existing impervious cover to bring lot into IC compliance.
Replacement of complete existing central heat and air system with or without duct work INSTALL NOTES: Replace 2 ton heat pump - upflow in closet on second floor. Alink. Replace zoning. Remove old pads and install new pad with bricks under. Install the primary controller downstairs and the secondary sensor upstairs.
***Timed Virtual Inspection: 07/06/2026 @ 9 AM*** Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Interior remodel of SFR. Expired MP 2025-043413 to be rolled into this permit (new HVAC system to be installed).
Replacement of condenser only
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Horizontal Gas System
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
HVAC replacement - Building B