Search Permits
2,931 results · type: commercial
Modification to existing Ansul R-102 6-gallon manifold system coverage. Results in CoC.
New partition walls for offices in existing suite. New architectural, mechanical, and electrical. Deferred fire alarm. Results in CoC.
Tennant Improvement.
Replace the primary 4000a breaker in the main SES. Like for like replacement, no changes to the equipment. New Electrical. Results in CoC.
Construction, repair, remodeling, demolition, and excavation work activities may be conducted between May 1st and October 15th of each year Monday-Friday between the hours of 5:00 A.M. and 7:00 P.M. between the hours of 7:00 A.M. and 7:00 P.M. on Saturday. Construction work outside of the permitted timeframes will require an afterhours permit. Afterhours permits for construction are subject to the following conditions and Building Official approval: Talis Construction would like to request to w
INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
INSTALL BACKFLOW PREVENTER ON EXISITING WATER LINE. SHALL COMPLY WITH CITY OF MESA ADOPTED ORDINANCES, CODES AND STANDARDS.
Demo existing Electrical, interior partitions, portion of exterior masonry, and storefront. New Demising wall, ADA compliant restroom, partition walls, MEP, architectural, and structural. 7,498 SF. Group M, B, and S-1 Occupancy. Type III-B Construction. Occupant load of 107. Special Inspections Required for Post Installed Anchors, Wood Construction, Masonry Construction, Concrete Construction, and Steel Construction. Results in CoO.
Modification to the existing Ansul system for proper coverage of the fryers which consists of (4) 3-flow point nozzles over (2) deep fryers, (1) 2-flow point in plenum, and (1) 1-flow point nozzle in duct. 15 total flow points.
The golf club is installing a new 600 AMP SES to power the pump for a replacement irrigation/landscaping well per engineered plans. Results in CoC.
PBI - LIKE-FOR-LIKE REPAIR/REPLACEMENT OF MULTIPLE EXISITING ELECTRIC PANELS. ALL WORK TO BE PERFORMED PER CITY OF MESA ADOPTED 2018 INTERNATIONAL CODE COUNCIL (ICC) FAMILY OF CODES, THE 2017 NATIONAL ELECTRIC CODE PRODUCED BY THE NATIONAL FIRE PROTECTION ASSOCIATION AND CITY OF MESA AMENDMENTS.
Replaced existing 400 amp service like for like For Units D5-8
MODIFY 2 EXISTING PRE-ACTION DETECTION AND CONTROLS SYSTEMS FOR THE BANNER MESA CORPORATE - PRE-ACTION ISOLATION VALVES ADD. ISOLATION VALVES WILL BE ADDED TO THE PRE-ACTION RISER.
EXPEDITE - This project involves rehabilitation, replacement, or upgrade of select equipment at the Val Vista Water Treatment Plant based on a comprehensive condition assessment and prioritization evaluation. Work items include rehabilitating the West Plant Bar Screens, upgrading the East Plant Bar Screens, installing new canal intake blanking plates, replacing select flocculator drive units, upgrading sludge collectors and launders in the East Plant final sedimentation basins, disconnecting aba
INTERIOR ONLY: Demo roof top equipment, floor, stairs, ceiling, mezzanine, mechanical, and electrical at existing building. New stairs, MEP, and architectural. Exterior elevation modifications and outdoor patio by separate permit. Special inspections required for concrete construction, steel construction, and epoxy/expansion anchors. New 2 inch domestic water meter. New gas meter. New 1200A 3 phase electrical meter. Deferred roof truss and floor truss. Deferred fire sprinklers, fire alarm, hood
Train Depot - elevations & building plans for West Main Village. New 364 S.F. shade structure. Special inspections required for drill & epoxy into post-tensioned slab and PT slab tendon stressing.
Remove fuel pumps and demo concrete pad. New equipment for 2 new diesel fuel lines at 2 existing pumps, new concrete pad, reinstall 8 existing pumps. Results in CoC.
Build 44 steel parking canopies to cover 50,436 sq. ft. Special inspections requires for soils, steel, welding. No electric.
Install two engineered metal canopies over (42) parking spaces. Group U occupancy: type V-B construction. Results in CoC.
Replaced existing 400 amp service like for like for Units D 1-4
Installation of Card Access security, no mag locks with free egress.
Installation of 147 L2 and (2) L3 EV chargers with associated transformers and switchboards. Asphalt will be removed and replaced at charger installation locations. Special Inspections for post-installed anchors. Results in CoC.
Installation of new material handling system (conveyors). Inclusive of electrical scope downstream from control panel. General Contractor will feed power from main switchgear to the control panel under a separate permit. Results in CoC.
Installation and testing of an upgraded control panel within an existing Michaels retail store. Results in a CofC.
CONSTRUCT A SEMI-PUBLIC SHOTCRETE SWIMMING POOL & SPA, REFLECTING POOL WATER FEATURE, AND FOUNTAIN ON THE GROUND LEVEL OF THE PROPERTY. SUPPLY AND INSTALL ALL POOL RELATED EQUIPMENT.
EXPEDITE-Plumbing connections for temporary construction trailers. Construction trailer permit currently under review PMT24-03169.
New 75,458 SF shell industrial building, type III-B construction. (2) new electric meters and 2-inch domestic water meter. (Ref: PMT25-10017 for foundation permit). Deferred fire sprinkler with fire pump, fire alarm, trusses, roof access, and vehicle access gate. Special inspection for structural items, electrical, and Emergency Radio Responder Coverage. Refer to Civil under permit PMT25-03332. Results in a CoC.
New 67,158 SF shell industrial building, type IIIB construction. (Ref: PMT25-10019 for foundation permit). (2) new electric meters and 2-inch domestic water meter. Deferred fire sprinkler, fire alarm, trusses, roof access and ladder, and vehicle access gate. Special inspection for structural items, electrical, and Emergency Radio Responder Coverage. Refer to Civil under permit PMT25-03332. Results in a CoC.
Remove and replace cell tower equipment at existing cell tower site. Results in CoC.