Search Permits
18,497 results · type: plumbing
plumbing
INSTALLATION OF NEW PLUMBING AND GAS FIXTURES FOR A NEW ONE-FAMILY DWELLING.
INSTALL NEW ANSUL VALVE AND GAS PIPING TO NEW COOKING FIXTURES AND EXISTING BASEMENT HWH SERVICING FIRST FLOOR RESTAURANT. PERFORM GAS PRESSURE TEST. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
New Plumbing fixtures, drain and exhaust lines associated with the work on the second floor.
PROPOSED PLUMBING WORK AT BASEMENT,1ST AND 2ND FLOOR. PLUMBING WORK AS PER PLANS. NO CHANGE TO USE, EGRESS OROCCUPANCY.
INSTALLATION OF PLUMBING WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS OF BUILDING.
American Gem (Suite 601) - Plumbing work on the 6th floor as indicated on drawings.
Plumbing work on the 15th floor (Acuity) as indicated on drawings.
Installation of new gas meters, gas piping, gas water heaters, gas kitchen appliances, plumbing fixtures, and associated water distribution piping connected to the existing incoming water and gas services. No change to use, egress or occupancy.
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 4bath] Work to include: Second Floor Addition First floor interior remodel Patio conversion new beds new baths [5bed 5bath].
Inground Pool and spa installation for existing SFR
EXPRESS: Shower to shower replacement (prefab base) in the same location.
Installing a new irrigation system
7 Trench to repair Sewer Yard Line Cleanout installation - The trench will be in between building 3 & 4.
Replacement of an existing water heater Replace existing water heater with new 50-gallon gas water heater (changeout/alteration). No structural change.
Express - Tub to shower conversion and replace toilet in hallway bathroom replace toilet in master bathroom
Bldg. 2 - New construction of 3 story SFR w/ attached carport covered front porch and uncovered wood steps at rear and rooftop uncovered balcony. 3 bedroom 3.5 baths
Excavate 25 trench to repair main drain line in yard
Replacement of an existing water heater Replace existing 50-gallon natural-gas water heater and replace associated drain line
CHANGE OF USE TO MEDICAL OFFICE Interior tenant finish-out for acupuncture clinic. Includes non-load-bearing partitions for treatment rooms and officeone hand washing sink electrical updates and flooring. Non-structural interior remodel no exterior work.
Installing a new irrigation system
9 Tunnel to expose and repair broken pipe under the house
New pool and spa
Replacement of an existing water heater like for like replacement of WH
New Fountain Foundation
Express: Replace walk in shower
Bldg. 1 - New construction of 3 story SFR w/ attached carport covered front porch and uncovered wood steps at rear and rooftop uncovered balcony. 3 bedroom 3.5 baths
New inground pool
Express - Tub to shower Conversion in hall bathroom Replace Exhaust fan in hall bathroom
New 2nd story addition to existing single residence.