Search Permits
16,855 results · type: electrical
Install mini split system.
Express - upgrade plumbing electric service and wiring add recessed lighting and outlets replace HVAC Exhaust vent and vent hood replace hot water heater with tankless convert tub to shower install cabinetry fixtures Ref: 2026-088696 EP
Building 1B New Construction of a 3 Story SFR 3/2.5
Building 1C New 2 Story SFR with attached garage 2/1.5
ePlan: Residential Expedited Review - New construction of a TWO-UNIT RES. Bldg 1 2-Story SF Res [3bed 2.5bath] with attached Garage.
ePlan: Residential Expedited Review - New construction of a TWO-UNIT RES. Bldg 2 2-Story SF Res [4bed 3bath] with attached Garage
Phase B of Interior renovation to existing industrial facility CU area with added new exterior equipment including wet scrubber.
ePlan: Residential Expedited Review: Interior remodel to existing two story residence repair existing decks. Existing code violation shall be resolved.
Transition from overhead service to underground service in order to maintain Austin energy clearance requirements for swimming pool extension. This includes running conduit underground from AE pole to inground pull box that we install then conduit from the pole box underground to the home and onto the line side of the meter. Need exact location from planning and development from Austin energy
ePlan: BAUS - First Time Finish out of New Airline Lounge (20500 SF)
Bldg 1: New pool for 3-unit use (with plumbing permit).
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
Restoring power for landscaping, pool and restoration repairs. Ok to release electric. Contractor responsible for lock out tag out and any damages resulting from the power being turned on. Failure to obtain a full permit in 30 days may result in the removal of power.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
Upgrade of existing 200 AMP overhead fed main to a 400 AMP. New electric meter. Results in CoC. Minimum required building inspections: Electric rough in and electric final.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
Installation of 200 Amp electric service - no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF TWO TESLA POWERWALL 3 BATTERIES. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIF
NEW ELECTRIC RUN FROM THE MAIN PANEL TO THE BEVERAGE STATION W/J-BOX FROM THE BEVERAGE STATION TO THE COUNTER & DETACHED STRUCTURE POST.
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO S
Installation of new electrical circuits for pergola fan, switch, and weatherproof outlet at pergola and BBQ area. Minimum required building inspections: footing, framing and final.
electrical
electrical
electrical
electrical
Request to disconnect and reconnect. Upgrading grounding system bonding gas meter installing surge protector upgrading existing 125 A meter base with 200 A service meter base replacing wires from meter base to main panel to accommodate 200 A service.
Requesting temp-pole overhead meter loop for remodel/addition ref; 2025 003373 BP