Search Permits
7,149 results · type: mechanical
New electric water heater
6 month vacancy.. 80 feet gas line, dryer, stove, tankless water heater, heating unit
6 month vacancy.. 80 feet gas line, dryer, stove, tankless water heater, heating unit
Oversight of Gas line install less than 100ft Increase Gas Meter Generator Permit
6 month gas test
6 month gas vacancy
Installation of 40 gallon electric hot water heater. Troy Jeffreys, 504-232-7880.
Installation of 40 gallon electric hot water heater. Troy Jeffreys, 504-232-7880.
Pressure Gas line to be certain of no leaks, get gas inspection done by City of New Orleans.
mechanical
mechanical
mechanical
Installation of temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
HEREWITH FILING REMOVAL AND REPLACEMENT OF EXISTING PACKAGE ROOFTOP UNIT. NO CHANGE IN USE, EGRESS OR OCCUPANCY
TEMPORARY ROOF PROTECTION AS PER DRAWINGS. ROOF/WINDOW PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Installation of Paint Spray Booth & Mixing Room, Duct work from units up to roof for Exhaust, Installation of Dry Chem fire suppression. No change to CO, Egress, or Occupancy.
INSTALLATION OF TEMPORARY BARRIERS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of a temporary roof protection via scaffold with netting per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing new Mechanical System (Heating System, Ventilation System, Air-conditioning Systems, Associated Ducts and Piping) in conjunction with NB #B01008423-I1
INTERIRO RENOVATION IN EXISTING TEA BAR ON 1ST AND ROOF, INSTALL NEW COOKING EQUIPMENT AND HOOD EXHAUST AS PER PLAN. FIRE SUPPRESSION SYSTEM WILL BE FILED SEPARATELY. NO CHANGE IN USE, OCCUPANCY AND EGRESS.
Mechanical changes as indicated on plans.
SUBSEQUENT APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 11TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY SHANTY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MODIFICATIONS TO EXISTING MECHANICAL SYSTEMS TO INCLUDE HVAC INSTALLATION AND ASSOCIATED DUCT WORK. NO CHANGE TO USE, OCCUPANCY OR EGRESS
Hereby filing to install new mechanical units with associated ductwork and piping for office renovation as shown on plans filed herewith. No change to use, occupancy or egress.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. ROOF PROTECTION SHALL COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE OF 2022.