Search Permits
11,812 results · type: mechanical
mechanical
mechanical
IT IS PROPOSED TO INSTALL NEW MECHANICAL SYSTEM AND RELATED DUCTWORK AS SHOWN ON PLANS AND ABANDONMENT OF EXISTING FUEL STORAGE TANK (IN PLACE). NO CHANGE OF USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of temporary netting per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Telehandler for building construction.
Telehandler for building construction.
Telehandler for building construction.
Installation of debris chute
TO INSTALL KITCHEN EXHAUST FROM CELLAR TO ROOF, AND REPLACE (3)HVAC UNITS.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL SYSTEMS MODIFICATION ON THE 9th FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Alterations to mechanical system on 33rd floor as per plans. No change to use, egress or occupancy.
MECHANICAL MODIFICATION WORK TO INCLUDE REMOVAL OF COOLING TOWERS AND ASSOCIATED PIPING AND INSTALLATION OF BATTERY EXHAUST.
PROPOSED MECHANICAL WORK IN CONJUNCTION WITH NB#Q01235259-I1.
INSTALL NEW MINI-SPLIT AIR-CONDITIONING SYSTEM AT APT# 5A OF EXISTING 5-STORY BUILDING WITH MECHANICAL WORK ONLY AS PER PLANS FILED HERE WITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY.
REPLACE TWO (2) SPLIT AC SYSTEMS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Proposed mechanical work and equipment for New Building Mix Use 22 story building.
Install new 17 seer 3 ton gas system
Balboa S415 C Right New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1610
Replacement of complete existing central heat and air system with or without duct work
15 DAY - Expand main office with new conference room. Build single restrooms and prayer rooms at multiple satellite offices throughout building. Update finishes throughout building. - OVA
Replacement of complete existing central heat and air system with or without duct work
Finish out for admin office.