Search Permits
7,146 results · type: mechanical
Tenant Remodel for medical office
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System
EXPRESS: Non structural exploratory work removing drywall insulation electrical plumbing and HVAC
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
ePlan: Residential Expedited Review - New THREE UNIT RES. New construction MODULAR 1-Story Single Family Res. [3bed 1bath]
New construction of 2 story sfr condo with 3 beds 2.5 baths and attached 2 car garage PUD
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System
Second generation tenant improvement converting an existing pizza shop into a ramen shop. No change in zoning use. The scope of work includes a new interior layout and associated mechanical electrical and plumbing improvements. The existing grease trap shall remain.
PB- New construction SFR 4 bed 4.5 bath with attached garage and front covered porch/rear covered patio
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton Heat Pump
Unit A - New construction of 2 story duplex (attached condo) each with 2 beds and 2.5 baths attached 2 car garage PUD
New Construction of 2-story single family residence with covered porch and patio 2 car garage 4 bedroom 3.5 bath
Replacement of complete existing central heat and air system with or without duct work HVAC change out only
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work **KAT SPARKS: Replace existing 3-ton vertical gas HVAC system with new like-for-like 3-ton vertical gas unit. No structural change.
Replacement of complete existing central heat and air system with or without duct work DOWNSTAIRS SYSTEM
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3.5 Ton AC System
2897BR NEW 2 STORY 4 BEDROOM 2 1/2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
2458BL NEW 2 STORY 4 BEDROOM 3 1/2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton AC System
RESIDENTIAL - FAU AND AC CHANGE OUT
RESIDENTIAL - FAU AND AC CHANGE OUT
RESIDENTIAL - AC CONDENSER CHANGE OUT
24 kW Generator Installation ** Entergy Elec / Delta Gas
We will supply and install a 18kW Air Cooled Generac generator. The generator will be placed on the left hand side of the house on a 36" aluminum stand. We will supply and install a 150amp Automatic Transfer Switch (ATS). An appropriately sized gas line will be installed, including any required utility upgrades or modifications.
New electric water heater
6 month vacancy.. 80 feet gas line, dryer, stove, tankless water heater, heating unit
6 month vacancy.. 80 feet gas line, dryer, stove, tankless water heater, heating unit