Search Permits
7,146 results · type: mechanical
TEMPORARY WORK PLATFORMS AS PER DRAWINGS. WORK PLATFORMS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY WORK PLATFORM PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
EQUIPMENT USE: INSTALLATION OF DUAL 5460# CAPACITY PERSONNEL HOISTS DURING NB FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEV APPL SUB TO ELEV DEPT.
INSTALLATION OF TEMPORARY BARRICADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Use of Knuckleboom for sign erection. This application is filed in conjunction with NB Q01002920-S1
Interior renovation of existing commercial space, including new interior finishes, installation of new equipment, and new plumbing fixtures. Work includes related plumbing and general construction as shown on plans. No change in use, egress, or occupancy
Removal of mechanical duct work, kitchen hood and related kitchen exhaust on the 40th floor and roof as indicated on drawings.
HVAC modifications as shown on the plans submitted herewith. No change to egress, use of occupancy as of right.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF A TEMPORARY HOIST COMPLEX AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. HOIST COMPLEX FILED IN ACCORDANCE WITH NYC BUILDING CODE, CHAPTER 33.
Mechanical modifications taking place on the 4,5 floors as per plans filed herewith. No change in use, egress or occupancy
Northwell LIJ EP Lab # 1: modify existing Mechanical systems to conform with hospital program renovations as per plans filed herewith.
Modifications to the existing HVAC system on the 19th Floor (Marketing Floor 21) as per plans. No change to use, egress or occupancy..
Filing herewith mechanical modifications as per plans
Application being filed for minor renovation of Apt 10G on the 10th floor. Work includes replacing 2 existing windows and 1 terrace door with a new enlarged sliding door to the terrace. New mini split HVAC system. No change in use, egress, or occupancy.
(9th FL -GC) FILING HERE WITH DRAWINGS INDICATING MECHANICAL DEMO WORK AS SHOWN ON PLANS. THERE WILL BE NO CHANGE OF USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Remove, replace, and install exhaust fans, ductwork. Installation of HVAC unit.
MOUNT SINAI - PEDIATRIC SCHOOL AND HOSPTIAL FACULTY SUPPORT - MECHANICAL MODIFICATIONS RELATED TO THE PEDIATRIC SCHOOL AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Direct replacement of two rooftop HVAC units
Modification/addition to existing HVAC and associated ductwork/piping as shown on drawings. No change in use, egress or occupancy.
MECHANICAL EQUIPMENT INSTALLATION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
IT IS PROPOSED TO PROVIDE NEW SUPPLEMENTAL COOLING MECHANICAL SYSTEMS AS SHOWN ON THE PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Mechanical work to replace AC unit on the 5th floor (Suite 503) as indicated on drawings.
Filing herewith mechanical/hvac scope for elevators lobbies at 3rd thru 6th floor as per plans. No change in use, occupancy, or egress under this application.
HVAC INSTALL FOR BUILDING ALTERATION TO ALL ELECTRIC HEATING AND COOLING ONLY. AS PER PLANS HERE WITHIN. NO CHANGE TO EGRESS, USE OR OCCUPANCY.
INSTALLATION OF 20 TONS OF AIR CONDITIONING SYSTEMS.
Installation of a mini split system in an existing Dunkin' Donuts store. No change in use, egress or occupancy is involved.
Mechanical modifications taking place on the 33rd floor (36th floor Construction) as indicated on the drawings.
FILING HEREWITH OF MECHANICAL DUCTED SYSTEM DISTRIBUTION SYSTEM INCLUDING NEW WATER SOURCE HEAT PUMPS, HEATING SYSTEMS, AIR DEVICES, EXHAUAST FAN AND TRANSFER FAN AND NEW SPACE CONTROLS
ICON INSTALLATION OF DUCT WORK,DIFFUSERS, FANS, A/C UNITS ANDRELATED MECHANICAL PIPING ON 8TH FLOOR AS PER PLANS FILED HEREWITH.