Search Permits
11,795 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Interior Remodel: Remove section of wall remove bar cabinetry remove bar cabinetry remove pantry. Remodel laundry area.
Replacement of complete existing central heat and air system with or without duct work
PB: New construction of 2 story SFR with 3 bathrooms and 5 bedrooms. attached garage.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New Construction of 2-Story SF Res [5bed 4bath] with habitable attic and attached garage
Replacement of complete existing central heat and air system with or without duct work mcarton
Remodeling 4 existing office areas into 4 new garages.
New 2-story single family residence 4 bed/3.5 bath with attached carport and covered porches All existing asphalt paving to be removed.
Replacement of complete existing central heat and air system with or without duct work Change out the existing 2.5-ton horizontal HVAC system with a like-for-like Rheem unit
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work upflow in a closet - system change out
Addition/ remodel of existing 1-story single-family residential to include: new kitchen water heater bathrooms and some interior structural changes; retro-actively permitting 30 yr old addition.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work RECKER
Highland 3313 B Left New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 692.62 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Replacement of complete existing central heat and air system with or without duct work
Creating 2 office spaces with a common hall and 2 restrooms and a janitor closet. [Office]
Tenant improvement of an existing space.
mechanical
mechanical
INSTALLATION OF TEMPORARY OVER HEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Gantry System installation for Alt 1 work approved under M01262427-I1
INSTALLATION OF SINGLE P/M HOIST (PM2) IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY