Search Permits
2,926 results · type: commercial
New traffic enforcement camera, pole, and foundation. New structural and electrical. Special inspections required for steel construction-welding, concrete construction, and helical anchor foundation. Results in CoC.
New shell building, 39,995 SF building and 536 SF canopy, type III-B construction with 2-hour exterior barring walls. The scope of work includes all associated civil, landscape, architectural, structural, mechanical, plumbing, and electrical, as shown on the plans. New (1) 2-inch domestic water meter, (1) 1-inch landscape water meter, and (1) electric meter. Special inspection for structural items and electrical. Deferred steel joists and girders, fire sprinklers, and fire alarm. Results in CoC.
DUPLICATE CERTIFICATE OF OCCUPANCY. NAME CHANGE ONLY: HOPE & HEALING ADDICTION TREATMENT CENTERS LLC. BOTH SUITES 101 AND 106, 8,741 SQ FT PROFESSIONAL OFFICE SUITES FOR HOPE & HEALING ADDICTION TREATMENT CENTERS LLC, (B) OCCUPANCY. EXISTING TYPE VB CONSTRUCTION. MAX 88 OCCUPANTS. NO WORK UNDER THIS PERMIT. THE INTENTION OF THIS PERMIT IS TO DUPLICATE A PREVIOUSLY PERMITTED OCCUPANCY CLASSIFICATION(S) ONLY. THIS PERMIT REQUEST DOES NOT AUTHORIZE OR APPROVE UNPERMITTED CONSTRUCTION. EXISTING OCCU
New traffic enforcement camera, pole, and foundation. New structural and electrical. Special inspections required for steel construction-welding, concrete construction, and helical anchor foundation. Results in CoC.
REPLACE EXISTING EST2 FIRE ALARM PANELS WITH NEW EST4 FIRE ALARM PANELS. REPLACE EXISTING ANNUNCIATOR PANEL WITH NEW EST4 MODEL. SITE IS BEING UPGRADED FROM HORN STROBE SYSTEM TO VOICE EVACUATION TO MEET CURRENT CODES. FIELD SMOKE AND HEAT DETECTION BEING REPLACED WITH NEW MODELS. ADDRESSABLE MODULES AND RELAYS TO REMAIN EXISTING.
ACCESS PERMIT - INSTALLING AN ACCESS SYSTEM WITH STRIKE LOCKS AND MAG LOCKS. THE SYSTEM WILL BE CONNECTED TO THE BUILDING SPRINKLER MONITORING SYSTEM.
New traffic enforcement camera, pole, and foundation. New structural and electrical. Special inspections required for steel construction-welding, concrete construction, and helical anchor foundation. Results in CoC.
Install 203,917 SF 2-story data center. IIB construction. B/ S-2 occupancy. Unlimited building area with 60 feet min. yards. Approval received for North property line shift 17-foot to allow 60-foot clearance from building. Special inspection required for fabricator, steel, concrete, masonry, soil, EIFS, fire lane, and emergency responder radio coverage. Deferred fire sprinklers, fire alarms, and electrical vehicle access gates. Civil Improvements under PMT24-05568. All signage and access con
Install solar panels and energy (batteries) storage system. Solar panels located on existing building rooftop and as vehicle parking canopies throughout existing parking lot.
RETROFIT OF EXISTING STREETLIGHT TO CURRENT STANDARDS. DEFERRED SUBMITTAL ON PROJECT: PMT24-09578
Install bulk CO2 tank and distribution system with detection monitoring and horn strobes for existing building.
New access control systems at parking lot gates and building multiple doors of new data center building. All doors are free egress. Approved with stipulations. See comments. Results in CoC.
Balcony and stair repairs at 6 locations inside existing apartment complex. Demo permit (PMT25-16531). New structural. Special inspections required for concrete construction, fabricated items, post-install/epoxy anchors, steel construction, and masonry construction. Results in CoC.
Replacing 15 Roof top units, 15 Curb adaptors and 3 exhaust fans. Approved as Noted. Results in CoC.
Install of EV Charging at R2 apartment complex parking. (4) new swtch zerova Ax48, single-port charges, dual-port configuration, pedestal mount. Results in CoC.
Nammo Annual Facilities Permit
New Development Walmart Fuel Station, 1,511 SF, type V-B construction, M occupancy convenience service store with 6,120 SF, type II-B construction, M occupancy Fuel Canopy. Special inspection for concrete, masonry, fabricated items, soils, EIFS. Deferred Prefabricated Fuel Canopy. Deferred fire sprinkler, fire alarm and HMIS. REF: PMT25-15856 for Civil onsite. Results in CoO
Install Three Aluminum Flagpoles (1)30Ft & (2)25ft
Construction of new SRP Flight Services hangar including administrative and support space. Site includes aircraft parking apron, vehicle parking, landscaping. Deferred fire sprinklers, fire alarms, paint booth, and cold formed metal framing. Water meter: (1) 1-1/2 inch domestic, (1) 1-inch landscape.
“Commericial Electrical Repair Like for Like-no plans required. Installation shall comply with City of Mesa codes and servicing electric utility requirements. DO NOT DISCONNECT UTILITY WIRES OR METERS. Schedule disconnect/reconnect with serving utility and obtain utility service requirements specific to your permit.”
Interior Tenant Improvement for an existing Sports Club including new fitness rooms and juice bar. Minor exterior modifications to include new paint and materials approved per ADM25-00778. Special Inspection for Emergency Responder Radio Coverage. Deferred fire sprinkler and fire alarm.
Install new fire alarm pull station and cellular communicator. Results in CoC.
Construction of 422 SF pool building, type VB construction, group U occupancy with (2) ADA restroom, (1) shower and Pool equipment room. Special inspection req. - steel, concrete, anchors, soils. REF: PMT25-09505 - Pool heater, REF: PMT25-09089 - Pool, REF: PMT22-12978 - Civil onsites. Approved with stipulation. Results in CoC.
Enlarge existing wall opening for new overhead door - move minor electrical for larger opening. Deferred fire sprinkler. Special Inspection for steel welding. Results in CoC.
REPLACING 2" DOMESTIC WILKINS 975XL2 BACKFLOW ASSY THAT HAS A HOLE IN THE BODY.
Patio Fencing
The requested modifications to the tower include: • removal of eight (8) antennas • removal of one (1) OVP • installation of nine (9) antennas • installation of three (3) RRU’s • installation of one (1) OVP
Add washers and dryers to all apartments. All work to be performed by the 2018 IBC, 2017 NEC and all Mesa amendments. Results in CoC.
Remove and replace (2) HVAC units like for like. Results in CoC.
Construction, repair, remodeling, demolition, and excavation work activities may be conducted between May 1st and October 15th of each year between the hours of 5:00 A.M. and 7:00 P.M. Monday through Friday and between the hours of 7:00 A.M. and 7:00 P.M. on Saturday. Construction work outside of the permitted timeframes will require an afterhours permit. Afterhours permits for construction are subject to the following conditions and Building Official approval: 1. The applicant must provide the