Search Permits
2,926 results · type: commercial
Development of standalone 17,967 SF, type II-B, group B occupancy Pitching Lab building and 6,394 SF, type II-B group B occupancy addition to existing club house building. Pitching lab to include mainly pitching lab training area and Video room, storage, IT and (2) ADA restroom. The Club House addition includes multipurpose / open office space and umpire lounge locker room and women's locker room. Special Inspection Req- Stee, concrete, masonry, epoxy/expand anchors, soils. Water Meter: 1.5inch
THIS IS A USE PERMIT FOR TWO (2) TEMPORARY CONSTRUCTION FIELD OFFICES FOR USE BY CONTRACTORS WHILE A PERMANENT BUILDING IS UNDER CONSTRUCTION. THE CONSTRUCTION TRAILER MUST BE PLACED ONLY ON THE PROPERTY THAT IS BEING DEVELOPED AND OUT OF ALL BUILDING SETBACKS. NO PUBLIC USE IS PERMITTED. THIS USE PERMIT SHALL BE NON-TRANSFERABLE FROM ONE OWNER OR LESSEE TO ANOTHER AND SHALL EXPIRE ON DECEMBER 31, OF EACH YEAR UNLESS EARLIER REVOKED. ESTIMATED TIME OF CONSTRUCTION TRAILER REMOVAL IS JULY, 31, 2
Demo front teller and customer area of bank in existing walmart. New partition wall for new office. New architectural, mechanical, and electrical. 703 SF. Group B occupancy. Type III-B Construction. Occupant load of 11. Deferred fire sprinkler, fire alarm, access control. Results in CoC.
Rehabilitation of reservoir no. 2 including replacement of the liner, installation of a new conduit between reservoir 2 and the GAC pump station, and replacement of the seals for the inlet gates at reservoir no 1, 2 and 3. Special inspections required. Results in a CofC.
Replace backflow assembly like for like
Development of 229,416 SF, Type II-B construction, group B occupancy single story data center. The development building is designed with tilt wall construction. The building will have supported chiller cooling platforms on south and north side of the buildings. Special Inspections Req - Emergency Responder Radio Coverage IFC 510. Special inspection required - Fire -Resistance Penetration and Joints, concrete, steel, masonry, anchors& bolts, soils, hi-pot testing. Deferred stairs & platforms, ele
Shell building with civil. Type IIIB 97,928 SF building and 389 SF soffit, S-1 and future B occupancy, 2-hour rated exterior barring walls. New 2-inch domestic, 1-inch landscape, and (1) electric meter. Special inspections required for structural items, ERRC, and Electrical. Deferred truss calculations, fire sprinklers, fire alarm, and electric gates. Approved as noted. Results in a CofC. New 2-inch domestic water meter. New 1-inch landscape water meter. Landscape meter address - 2837 N 58TH C
Removing existing gas line off property and rerouting the meter directly in front of BRI at the northwest corner of building. Plan to stub out 36-inches from above grade, run gas line vertical up the front wall then 90 to inside of the building and run it exposed through the trusses at BRI. Black iron pipe to be used on the interior and galvanized on the exterior. All-thread with loop hangers will be used to support the interior line of BRI. Connections to all appliances/units in need of gas usi
TENANT IMPROVEMENTS
TENANT IMPROVEMENTS
TENANT IMPROVEMENTS
EXPEDITED - THIS IS A USE PERMIT FOR A TEMPORARY CONSTRUCTION FIELD OFFICE FOR USE BY CONTRACTORS WHILE A PERMANENT BUILDING IS UNDER CONSTRUCTION. THE CONSTRUCTION TRAILER MUST BE PLACED ONLY ON THE PROPERTY THAT IS BEING DEVELOPED AND OUT OF ALL BUILDING SETBACKS. NO PUBLIC USE IS PERMITTED. THIS USE PERMIT SHALL BE NON-TRANSFERABLE FROM ONE OWNER OR LESSEE TO ANOTHER AND SHALL EXPIRE ON DECEMBER 31, OF EACH YEAR UNLESS EARLIER REVOKED. ESTIMATED TIME OF CONSTRUCTION TRAILER REMOVAL **MARCH 3
Install pendent sprinkler head to accommodate new ceiling layout. Install upright sprinkler heads to accommodate new full height demising wall.
BLD B - 83371 SQ FT 4 industrial buildings. See PMT22-13972 for offsite improvements and irrigation water meters. PARCEL- 30430023F. DEFERRED FIRE SPRINKLERS. DEFERRED FIRE ALARM. DEFERRED ELECTRIC VEHICLE GATES. DEFERRED PREFABRICATED FIRE PUMP HOUSE. SPECIAL INSPECTION - EMERGENCY RESPONDER RADIO COVERAGE.
Arco Construction would like to request an afterhours work permit for the civil construction (PMT21-19461) at Sossaman Business Campus. We request to work this M-F, from 5:00PM to 6:00AM. See below for the information requested: 1. Dates, times and specific location(s) 6/12/23 – 3/31/25, 5:00PM-5:00AM, 3327 S Sossaman Rd, Mesa AZ 85212 2. Location of work 3327 S Sossaman Rd, Mesa AZ 85212 3. Schedule of hours and days 5/24/23 – 6/24/24, 5:00PM-5:00AM 4. Scope of work to be performed
Install grade level swimming pool with equipment. Artistic paver coping and plaster interior finish. Pool area 1,068 sf.
Pipe was rusted over and had a leak that needed to be repaired like-for-like. Work has already been done and needs an inspection
Install new pedestal electrical meter. New 100A Single Phase Electrical Meter. Results in CoC.
Six Shade sails to be placed in three different areas of the property: Diamonds entrance, between soccer fields, and outside soccer fields bathrooms. Use class A-5. Type II-B. HSS Steel post and beam structure on 24-inch diameter concrete piers. With Fabric roof-canopies. Special welding Inspection
Titan alarm to replace existing fire alarm panel
TENANT IMPROVEMENTS
MISCELLANEOUS ELECTRICAL
Inground shotcrete commercial pool & spas w/ associated recirculation equipment. Structural design per AMMTec Consultants, PLLC. All utilities (electric, water, sewer, gas, etc.) & barriers are the responsibility of the owner & are not part of this submittal.
Roadway improvement plan that is over the City of Mesa 54" transmission line. We are submitting for the review for relocation of the ARV's.
Gas line repair like-for-like that effected units 4 & 2 at a junction point.
NON-RESIDENTIAL - AC CHANGE OUT
STORAGE RACKS
Please note that before a damage permit is issued an estimate showing the Company doing the work, the subject address, scope of work, materials, and labor from either the contractor or the insurance company will be required. A written scope of work is required to approximate the cost of the permit, verbal estimations shall not be used. This structure is to be restored like for like in compliance with 2017 NEC, 2018 IRC/IBC requirements. Any alterations or changes will require submitting plan
(25) Addition of Pallet Racking High Pile Storage Installation, Periodic special inspections required for anchor installation. Results in CoC.
Install new delayed egress system at lobby doors. Results in CoC.