Search Permits
11,778 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work
Install mini split system.
Interior remodel of existing office suite. No change of use. No access control.
Interior remodel of existing office suite to demise new office suite 220 with associated MEP scope. No access control. (Building 2 Unit 220)
Replacement of complete existing central heat and air system with or without duct work REPLACE 4 TON 17 SEER SYSTEM
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Replacement of the HVAC System through Austin Energys Weatherization Rebate & Loan program.
New covered patio over existing wood deck area
mechanical
mechanical
EQUIPMENT USE: SINGLE 7000 # CAPACITY PERSONNEL HOIST DURING BLDG ALTERATION, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
INSTALLATION OF TEMPORARY CONSTRUCTION BARRIERS AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ENGINEERED ENCLOSURE SYSTEM SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation Of Temporary Material Hoists As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
STORAGE OF MATERIAL / EQUIPMENT ON TOP OF HEAVY DUTY SIDEWALK SHED. STORAGE SHALL NOT EXCEED 50 PSF. SHED FILED UNDER SEPARATE APPLICATION. STORAGE SHALL COMPLY WITH CH#33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
Modifications to the existing HVAC System: Demolition of mechanical equipment, ductwork and accessories on the 38th Floor as per plans (IMC Demo Phase.) No change to use, egress or occupancy.
Installation and use of mini crane temporary construction equipment as per plans filed herewith.
mechanical equipment will assist with demolition, and debris chute will be used to lower debris
debris chute will be built to lower debris from floor to floor. Mechanical equipment will be used to assist with full demolition.
INSTALLATION OF SINGLE PERSONNEL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL DEBRIS CHUTE AS PER PLANS IN ORDER TO PERFORM EXTERIOR REPAIRS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DEBRIS CHUTE SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE
INSTALLATION OF TEMPORARY PLYWOOD ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
MECHANICAL SYSTEMS MODIFICATION ON THE 13TH AND 14TH FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
GENERAL RENOVATION ON EXIST. RESIDENTIAL BUILDING WITH REMOVE PARTITIONS, REPAIR/REPLACE/NEW PARTITIONS, FLOORING, CEILING, DOOR, WINDOWS, STAIR AND PAINTING WORK. ALSO INSTALL SPLIT AC UNITS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.