Search Permits
11,778 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 ton gas horizontal (upstairs) **Zip Code 78739**
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 ton horizontal gas (upstairs) LIKE FOR LIKE: 4 ton two stage horizontal gas (downstairs) **TWO SYSTEM CHANGE OUT**
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 ton 2-stage vertical gas
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 Ton Horizontal Heat Pump System
Replacement of complete existing central heat and air system with or without duct work
Exterior Facade Upgrade Of The Existing Hyundai Showroom And Service Building. Scope Of Work Includes Interior Renovations To Both Buildings And The Addition Of A Small Canopy At The Back Of The Showroom. No Major Site Demolition Or Construction Is Included In This Project.
Replacement of complete existing central heat and air system with or without duct work *JAMES RAMIREZ: Replace existing 4-ton horizontal gas HVAC split system with a like-for-like 4-ton horizontal gas system; no structural change.
New 2-story 3 bedroom 2.5 bathroom dwelling unit with attached carport covered front porch and side covered patio.
Replacement of complete existing central heat and air system with or without duct work 3 Ton Horizontal Gas 2 Stage Ducts/Comp/SP/Insulation
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 ton horizontal gas
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Two Stage vertical gas
Replacement of any self-contained packaged units Replacement of 1x like-for-like 7.5 Ton RTU
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work (RTU)
New 2-story 3 bedroom 2.5 bathroom dwelling unit with attached garage covered front porch and rear covered patio.
mechanical
mechanical
INSTALLATION OF WORKING PLATFORM AS SHOWN ON DRAWINGS. NO CHANGE ON USE EGRESS OR OCCUPACNY. WE SHA;; COMPLY WITH CHPATER 33 OF 2022 B.C
TEMPORARY ENGINEERED ENCLOSURE SYSTEM DURING BLDG DEMOLITION, FILED SEPARATELY. ENGINEERED ENCLOSURE SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OREGRESS UNDER THIS APPLICATION.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
REPLACEMENT OF HVAC UNITS ON THE FIRST FLOOR AND MEZZANINE ROOF WITH A TOTAL CAPACITY OF 3.5 TONS, WORK BEING PERFORMED IN THE ATM ROOM AND BASEMENT. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.
INSTALLATION OF MATERIAL ONLY HOIST AS PER DRAWINGS. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BLDG CODE. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Modify the existing HVAC ducts and vents.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER DRAWINGS, ROOF PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Mechanical work on the 15th floor (Acuity) as indicated on drawings.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation and use of temporary knuckleboom construction equipment as per plans filed herewith.
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS. TROLLEY BEAM SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.