Search Permits
7,146 results · type: mechanical
Repair gas leak in the kitchen area. Gas line was locked off by Delta Gas.
Gas line. New water heater, stove, dryer and a/c
GAS VACANCY- METER RELEASE
GAS METER OUT OVER 6 MOS.
mechanical
mechanical
TEMPORARY NEEDLE BEAM PLATFORMS AS PER DRAWINGS. NEEDLE BEAM PLATFORMS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF SYSTEM STAIR TOWER AS PER PLANS. SYSTEM STAIR TOWER SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
SCOPE OF WORK:PROVIDE MECHANICAL WORK FOR THE 14TH FL OF AN EXISTING OFFICE BUILDING, WORK INCLUDE INSTALLING AC INDOOR UNITS, DUCT WORK AND VENTILATION SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
INSTALLATION AND USE OF TEMPORARY MINI CRANE AS PER PLANS HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
TEMPORARY SHORING SYSTEM TO SUPPORT LOAD OF HVAC UNITS IN CONJUNCTION FACADE RESTORATION. NO CHANGE IN USE, EGRESS OR OCCUPACNY. WE SHALL COMPLY WITH CHPATER 33 OF 2022 B.C.
Use of Knuckleboom for building construction. This application is filed in conjunction with NB B01241582-I1
INSTALLATION OF 7,000 LB DUAL PERSONNEL HOIST CARS AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
ENGINEERED ENCLOSURE SYSTEM AS PER DRAWINGS. ENGINEERED ENCLOSURE SYSTEM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
PROPOSED (2) A.C UNITS AT OSP
Proposed Mechanical HVAC Split units
Mechanical modifications taking place on the 4th, 5th, 6th floors as per plans filed herewith. No change in use, egress or occupancy.
Filing to install store kitchen hood and ductwork as per plans. No change in use, egress or occupancy.
demolition of interior ductwork and mechanical equipment on 40th floor
Mechanical work on the 20th floor (HVAC project) as indicated on drawings.
Mechanical work as shown on plans filed herewith. No change in use, egress, or occupancy
INSTALLATION AND USE OF A TELEHANDLER (MAGNI RTH 6.35SH OR MANITOU MRT 2150 OR MANITOU MRT 2550) AS PER PLANS SUBMITTED. TELEHANDLER SHALL COMPLY WITH CHAPTER #33 OF NYC BUILDING CODE. THIS APPLICATION INVOLVES NO CHANGE IN OCCUPANCY, USE OR EGRESS.
DIRECTLY REPLACE TWO CONDENSER UNIT ON THE EXISTING ROOF WITH MECHANICAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR CERTIFICATE OF OCCUPANCY
MECHANICAL WORK AS SHOWN ON PLANS.
REPLACEMENT OF EXISTING MECHANICAL UNITS AND IT'S ASSOCIATED PIPING.
INSTALLATION OF ONE (1) OUTDOOR VRF UNIT AND ONE (1) INDOOR DUCTED FAN COIL UNIT. WORK TO INCLUDE ASSOCIATED REFRIGERANT PIPING AND DUCTWORK. NO CHANGE TO USE, OCCUPANCY, OR EGRESS.
HEREWITH FILING MODIFICATION TO EXISTING MECHANICAL SYSTEM IN CONJUNCTION WITH INTERIOR RENOVATIONS OF 11TH FLOOR RESTROOM AND CORRIDOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.