Search Permits
16,850 results · type: electrical
7 DAY - renovation to include like for like HVAC replacement updated lighting fixtures/switches/outlets and replacement of new cabinets countertops and equipment construction of fire-rated partitions between units conversion of tubs to showers replacement of all gypsum board and interior doors foundation repair and roof repairs related to water damage. (2nd floor building C)
Replace wire due to wire theft
install 40kw home standby generator
Install Level 2 EV Charger
ePlan: Commercial Expedited Review - Change of Use from Cocktail Bar to a Full-Service Restaurant (22620 SF)
Remove existing service entrance equipment. Install new 200A main breaker panel meter socket and service entrance conductors sized per 2023 NEC. Install proper grounding electrode system (ground rods/water pipe bonding) and equipotential bonding.
Backup battery system along with new main service disconnect. No updates to utility meter only will be disconnecting and reconnecting after job completion.
Backup battery system that backs up home along with new main service disconnect. No updates to utility meter only will be requesting a disconnect and reconnect.]
Residential installation of a 3.2kW Roof-mounted solar with 8 panels.PV Array area of 172.92 sqft.
Change of use from Mercantile (food sales) to Restaurant.
electrical_permit_(r)
electrical_permit_(c)
electrical_permit_(r)
electrical_permit_(r)
200 AMP to 400 AMP service upgrade. (1) new electric meter. Reviewed as noted. Results in CoC.
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES AND ONE TESLA POWERWALL3 EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
Install three new 120-volt GFCI-protected receptacle outlets: one in each of two bathrooms and one exterior outlet near the electrical panel. Exact outlet locations are shown on the attached floor plan. The exterior receptacle will be weather-resistant and installed with a weatherproof in-use cover. Includes required wiring, electrical boxes, and connections to the existing residential electrical system. No electrical service or panel upgrade.
Installation of a 60A dedicated circuit breaker for a wall connector EV charger label II located in the garage. Existing 125A sub-panel. Electrical shall be installed per manufacturer's specifications and comply with 2024 IRC, 2023 NEC and SRP standards. Minimum required building inspections: Electric rough in and electric final.
PERMIT IS ONLY FOR INSTALLATION OF ONE LG RESU 16H PRIME BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL 3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES
Trench from main panel to new subpanel location at existing SFR. 18-inch depth, 1 1/2 PVC 2 AWG copper wire feeders. Minimum required building inspections: Electric rough in and electric final.
electrical
electrical
Installation of a 22kW Generac generator with 200 AMP ATS
Homebuilder Loop for SFR - 2026-058720 BP Permit has been reopened for t-pole relocation per AE
SOLAR PANEL INSTALLTION WITH A SYSTEM SIZE OF 7.36 KW SOLAR SYSTEM.
ETJ- New construction SFR
Replacing the customers meter and panel