Search Permits
18,449 results · type: plumbing
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
Plumbing Permits
INSTALLATION OF 113-FT OF2-IN PE GAS LINE BURIED 30-IN WITH 14 GAUGE TRACER WIRE FROM GAS METER TO 400K BTU POOL HEATER, 100-FT OF 2-IN PE GAS LINE TO 80K BTU FIREPIT. ALL GAS LINES TO BE INSTALLED PER 2018 IFGC & COM GAS REQUIREMENTS. COM GAS ENGINEERING (480-644-2909) TO DETERMINE IF THE METER NEEDS TO BE UPGRADED. REF SWIMMING POOL PERMIT PMT26-13129.
PLUMBING PERMIT TO REPLACE EXISTING WET SPACE WITH NEW SHOWER IN MASTER BATHROOM. NEW VALVE AND PREFABRICATED ACRYLIC WALLS. NO STRUCTURAL CHANGES. NEW INSTALLATIONS WILL TIE INTO EXISITING PIPING. NO CHANGE TO OVERALL SQUARE FOOTAGE. NO OTHER WORK UNDER THIS PERMIT. ALL WORK TO COMPLY WITH 2024 IRC AND 2023 NEC.
APN: 220-43-008 CITY SERVICES OUTSIDE CITY LIMITS (SEWER) 10310 E BILLINGS ST APACHE JUNCTION AZ
plumbing
plumbing
plumbing
Plumbing modifications as per plans. No change to use, egress or occupancy.
EXISTING 2 FAMILY HOUSE WITH PLUMBING WORK AT CELLAR,BASEMENT,1ST AND 2ND FLOOR.JOB FILED TO RELATED TO ALT2 APPLICATION #BA01443981-I1.NO CHANGE IN USE ,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
Remove (1) stove, (1) sink and (1) 3pc bathroom. Install (1) shower, (1) water closet and (1) lavatory in Cellar. No change in use occupancy or egress.
FILING FOR NEW FIRE PIT ON EXISTING TERRACE AND NEW GAS LINE FROM EXISTING GAS SUPPLY.
installation of new plumbing fixtures for the renovation of the existing store. Filed in conjunction with ALT II app#Q01426313-I1-I1
INSTALLATION OF NEW PLUMBING FIXTURES AND EQUIPMENT
Plumbing alterations on the 1st floor for installation of new restroom fixtures and related piping; related work as per plans.
New construction in-ground pool concrete deck and associated equipment pad.
Inground pool and spa with autofill and gas heater. No deck
Reroute approximately 60 feet of existing 2 grinder pump discharge piping and connect to the existing city connection
Interior remodel for 1-story single family residence. Remodel of kitchen replace all kitchen cabinets/countertops add electrical outlets and stove ventilation exhaust. Update gas/water lines under house.
*Green Building* New 2 Story Condominium Single Family Residence 2 Bdrm 2.5 Bath Porch w/ 2-Car Garage PUD
Tunnel up to 15 to replace 1 full bathroom drain lines. Unit A
ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas (116916 SF)
Building 2 New two story SFR with attached garage and balcony 3/3