Search Permits
2,926 results · type: commercial
Remove and replace electrical equipment with new at existing light pole. New 15A breaker for new equipment. Results in CoC.
TI for equipment build out with MEP's, and exterior screening and foundations. Special inspection for concrete, post installed anchoring, steel. New gas meter. Results in CoC.
Install (1) twist lock outlet L22-30R form panel WH1. New electrical. Results in CoC.
This permit is specifically for the temporary shoring work to allow the structural engineer to complete a full evaluation and determine whether any portion of the building can be preserved or if full demolition will be required. Demolition of unsecured walls and roof sections to facilitate the installation of temporary shoring, in accordance with the engineer’s assessment. Associated COB Case: COB26-00025
TENANT IMPROVEMENTS
Replacing the electrical infrastructure of the mobile home community. New 600A SES for spaces 1-23. New 600A SES for space 53-70. New 600A SES for spaces 42-81. New 400A SES for shop building and spaces 201-210. Each space has 100A pedestal fed from SES.
Development of 1 story Shell Building for BLDG#15, PEMB structure with insulated metal panels, 423 SF, type II-B construction, group F-1 occupancy and an attached 1,525 SF canopy, type II-B construction, U occupancy with approx. 133 SF platform. Special inspection req. steel, concrete, masonry, soils, Fire lanes /roadways. Deferred fire alarm, fire sprinklers. REF: PMT25-02731 Civil Plans, REF: PMT25-01899 Foundation, REF: PMT25-13767 - Approved code modification for 2018 IBC 414.6.1.3 to excee
Installation of tankless gas water heater with meter clearance. No other work under this permit. Reviewed with comments. Results in CoC only.
Install one 120 gallon aboveground vertical propane cylinder and two bollards for protection. Set tank on existing concrete foundation and connect to existing gas piping stub-out for the existing interior commercial kitchen. No CofO under this permit. Separate TI required.
New 100 AMP electrical pedestal for new sign. New meter. Results in CoC.
Development of 1 story Canopy structure for BLDG#18, PEMB structure with perforated metal screen walls, 2,485 SF, type II-B construction, group U occupancy with approx. 296 SF platform. Class 1 Div2 classified area. Special inspection req. steel, concrete, soils, Fire lanes /roadways. Deferred Fire Alarm and Fire Sprinklers. REF: PMT25-02731 Civil Plans, REF: PMT25-01899 Foundation, REF: PMT25-02993 full building TI, REF: PMT25-13767 - Approved code modification for 2018 IBC 414.6.1.3 to exceed
New 600A 3 phase electrical meter and electrical equipment for landscaping and lighting in new housing development. Results in CoC.
Verification of occupancy for a Senior living use. 3,465 sf. R-4 Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
Verification of occupancy for a Senior living use. 3,464 sf. R-4 Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
Verification of occupancy for a Senior living use. 3,467 sf. R-4 Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
Verification of occupancy for a Senior living use. 3,467 sf. R-4 Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
Verification of occupancy for a Senior living use. 3,454 sf. R-4 Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
Verification of occupancy for a Senior living use. 3,467 sf. R-4 Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
Verification of occupancy for a Senior living use. 3,467 sf. R-4 Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
Verification of occupancy for a Senior living use. 3,437 sf. R-4 Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
Verification of occupancy for a Senior living use. 3,812 sf. B Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
Verification of occupancy for a Senior living use. 3,467 sf. R-4 Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
Addition to existing fire alarm system to include new lunch tent. Extending existing SLC loop and Audio Loop from the FACP located in the LV MEB building. Addition of new booster power supply for strobe circuit located in the lunch tent. Tent PMT26-00449.
TENANT IMPROVEMENTS
OTHER
STORAGE RACKS
Install new electric sub-panel and branch circuitry and 90-amp main breaker in existing 400A service entrance equipment for apt 117. Results in CoC.
Verification of occupancy for a Senior living use. 3,314 sf. R-4 Occupancy. Building has fire sprinkler and Fire alarms. No work under this permit.
New 1-inch domestic water meter to service the pool house. The water service and meter box are currently installed in accordance with the civil water improvement plans, include on the AB water plans for PMT22-04299.
TENANT IMPROVEMENTS