Search Permits
7,146 results · type: mechanical
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
MEP systems upgrade and expansion along with addition of server rack and associated equipment in an existing building. **Rev #1: LAB MEP Equipment Upgrade to include new canopy and foundation pad. -AP 5/26/26 **
Replacement of complete existing central heat and air system with or without duct work Install replacement of 3 Ton Heat Pump System and Replace/Rebuild the Supply Plenum
Balboa S415 C Left New - 1 Story SFR w/ 4 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
7 DAY - Interior remodel. change single door to double door. bench lab with table power. open call b at existing admin space - OVA
Replacement of complete existing central heat and air system with or without duct work HVAC changeout: replace existing 4-ton split HVAC system with like-for-like Goodman 4-ton system; no structural change. | Property in an apt building
Replacement of complete existing central heat and air system with or without duct work
New construction 2-unit use single-family residential 1-story 1 bedroom 1 bath with covered front porch.
7 DAY - Electrical: adding power for 3 ovens + 3 hoods New main gas line + 3 supply lines Replacement of Complete duct system only Adding intake/exhaust duct for (3) ovens along with (6) new fans AT EXISTING BUSINESS - OVA
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system through Austin Energys Weatherization Rebate & Loan program.
Construction of podium swimming pool associated multifamily building (2020-016857 PR)
Boone S413 D Left New - 1 Story SFR w/ 4 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.