PermitDig

Search Permits

16,850 results · type: electrical

ePlan: Commercial Expedited Review - [APPROVED New Construction of Behavior Health Hospital located at the Texas Neuro Rehab Center Campus (46219 SF).

1106 W DITTMAR RD BLDG 30, AUSTIN
Sep 3

Repair breaker enclosure and wire leaving meter due to oxidation

409 E WILLIAM CANNON DR UNIT 230, AUSTIN
Sep 3

New construction of 2 story sfr 5 beds 3.5 baths attached garage

4813 BRIDWELL LN, AUSTIN
Sep 3

ePlan: Residential Expedited Review - New Construction of a 2-Story SF Res [5bed 4bath] with attached carport

1909 BURBANK ST, AUSTIN
Sep 3

Install new canopy sign above main entrance

1900 CROSSING PL BLDG 1, AUSTIN
Sep 3

Replace wire due to wire theft

1201 BARBARA JORDAN BLVD BLDG 6 UNIT 300, AUSTIN
Sep 3

(ETJ) Permanent Service for New Construction of Warehouse

7811 BURLESON RD BLDG 1, AUSTIN
Sep 3

Bldg.2 New construction of 2 story 2 bedroom 1 bathrooms SFR w/ covered front and rear porch.

2204 S 3RD ST BLDG 2, AUSTIN
Sep 3

New construction of single building based on Volume Builder Approved (2024-067871 VB) Plan 9-CB-L. This is a 2 Story building with height of 31-7 and 3129 square feet.

9803 RIBELIN RANCH CT BLDG 3, AUSTIN
Sep 3

temporary tpole for new construction for Stoney Chase Ref: 2026-111801 BP

13000 STAYWELL WAY, AUSTIN
Sep 3

new 3-story SFU 4 bed 4 bath with basement storage attached garage and rear covered patio/balcony

2402 KATHY CV, AUSTIN
Sep 3

Rewire Temp Power Pole 2022-121563 BP

3315 FAR VIEW DR, AUSTIN
Sep 3

Install new 444.69kW rooftop solar system to existing commercial only.

3800 JACKSON AVE BLDG TNFM, AUSTIN
Sep 3

Good morning the service mast was pulled off the exterior of the duplex located at 9810 Lake Ridge Drive last Thursday during the rain/wind storms. We arrived on Friday morning to observe and noticed the still energized electrical lines laying on the deck. Both tenants had to temporarily vacate the structure and AE disconnected the power Monday afternoon. We are in the process of rebuilding so the tenants can come back home. Stand alone duplex unit A & B. Thank you and please call with any quest

9810 LAKE RIDGE DR BLDG A, AUSTIN
Sep 3

Rebuild the electrical main service. New meter can main breaker panel grounding and bonding. AE scheduled shutdown req.

1809 GLENCLIFF DR, AUSTIN
Sep 3

Express: Whole house of siding being replaced with James Hardie cement fiber planks. House of windows being replaced with vinyl windows.

7723 KIVA DR, AUSTIN
Sep 3

Replace wire due to wire theft

1201 BARBARA JORDAN BLVD BLDG 11 UNIT 100, AUSTIN
Sep 3

New construction of 2 story single family residence 2-car garage 3 beds 2.5 baths. Condominium site plan

5001 PECAN SPRINGS RD BLDG 23, AUSTIN
Sep 3

Install Level 2 EV Charger

5800 MISTY HILL CV, AUSTIN
Sep 3

Electricla Upgrade

1502 HOLSTEIN DR, AUSTIN
Sep 3

Install Level 2 EV Charger

6237 CARRINGTON DR, AUSTIN
Sep 3

Upgrade main service panel.

7011 ASBURY DR, AUSTIN
Sep 3

Replace wire due to wire theft

1201 BARBARA JORDAN BLVD BLDG 11 UNIT 200, AUSTIN
Sep 3

applying for electrical upgrade permit for an overhead rack service

8107 MULEY DR, AUSTIN
Sep 3

New cabana/ accessory structure to Bldg. 1 containing conditioned half bathroom and storage with attached covered porch.

2204 S 3RD ST, AUSTIN
Sep 3

install of box office sign above ticket window

1900 CROSSING PL BLDG 1, AUSTIN
Sep 3

(ETJ) Permanent Service for New Construction of Warehouse

7811 BURLESON RD BLDG 3, AUSTIN
Sep 3

Replace wire due to wire theft

1201 BARBARA JORDAN BLVD BLDG 4 UNIT 450, AUSTIN
Sep 3

Replace wire due to wire theft

1201 BARBARA JORDAN BLVD BLDG 12 UNIT 500, AUSTIN
Sep 3

(ETJ) Permanent Service for New Construction of Warehouse

7811 BURLESON RD BLDG 2, AUSTIN
Sep 3