Search Permits
16,850 results · type: electrical
BASE: Installing a backup battery system and additional meter socket.
Installation of EVC in covered garage.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
ENCLOSE EXISTING 12X12 PATIO WITH UNTOUCHED BALCONY ABOVE. ADD OPERABLE WINODWS AND DOOR. RELOCATE EXISTING SWITCHES RELOCATE OUTLETS
BASE: Installing a backup battery system and additional meter socket.
new office and studio with sauna
BASE: Installing a backup battery system and additional meter socket.
T-pole Ref: 2026-096623 BP
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
EV circuit installation. Fed from main electrical service run on exterior wall. Protected by 60a GFCI breaker. EV charger is hardwire type.
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
electrical_permit_(r)
PERMIT IS ONLY FOR THE INSTALLATION OF TWO FRANKLIN BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AND
PERMIT IS ONLY FOR THE INSTALLATION OF ONE FRANKLINWH BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDUL
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE TESLA POWERWALL 3. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR
INSTALLATION OF A 60 AMP DEDICATED CIRCUIT BREAKER FOR A WALL CONNECTOR VEHICLE CHARGER IN THE GARAGE. EXISTING 400 AMP SERVICE METER. ELECTRICAL SHALL BE INSTALLED PER MANUFACTURES SPECIFICATIONS AND COMPLY WITH 2024 IBC, 2023 NEC AND SRP STANDARDS.
PERMIT IS ONLY FOR THE INSTALLATION OF TWO TESLA POWERWALL3 BATTERIES. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE F
electrical
electrical
electrical
Austin Energy comes to take the electrical meter for reasons We need to check the electrical service for looks everything looks up to code and is safe Also need an inspector to come and check
Replace (2) ABB Terra EV 184 Dispensers and Install (2) 400 kW Alpitronc HYC400 EV Chargers New parking lot striping New concrete curbing to match existing concrete curbing new bollard sleeves install (3) EV sign posts
Installation of a 200A Service-Rated Automatic Transfer Switch 24kW whole home generator additional grounding and type 2 surge protection
Build temporary service for construction. Ref: 2026-101787-BP
Add 1540 Sqft 2nd story addition consisting of 2 new bedrooms 2 full bathrooms an office and media room. Existing 1st floor renovation includes new flooring refurbished shower tile surrounds primary bath and 2 bath Tub to shower conversion at 2nd bath.