Search Permits
16,850 results · type: electrical
Replace federal pacific electric panel and upgrade service to 200amp.
Hard-wired installation of customer-supplied Emporia Pro Level 2 EV Charger. Charger location sharing wall with electrical service.
Change of Use to Medical Office and Interior non-structural remodel.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Install Level 2 EV Charger
BASE: Installing a backup battery system and additional meter socket.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Office Habitable Attic Covered Porch Covered Patio and Attached Garage.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Generator replacement. Existing natural gas NG generator and its pad will be removed the new 4 x 8 pad to be poured to install new NG generator. A new ATS will be installed to replace existing on AT and Ts existing shelter building
TEMPORARY TPOLE FOR NEW CONSTRUCTION IN EASTON PARK
Replacing current 200A panel with another 200A panel to allow more spaces and bring up to current NEC code regulations AFCI/GFCI etc. Adding 60AMP EV Charger
Replacement of neighborhood pool. Demo permit separate 2026 015347 BP
New 1-Story addition to enlarge kitchen and enclose back patio add uncovered wood deck partial garage conversion to laundry room Demo as noted in plans. Full kitchen remodel remodel 3 bathrooms to 3.5 move water heater concrete HVAC plumbing and electrical as needed to remodel kitchen.
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Install Level 2 EV Charger
Home Builder Loop for New SFR COA Ref: 2026-113748 BP Bluebonnet
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Hook up temp pole [T-POLE] ETJ NO BP *FOURPLEX
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
Install Level 2 EV Charger
BASE: Installing a backup battery system and additional meter socket.
BASE: Installing a backup battery system and additional meter socket.
addition and renovations at o Henry Middle School