Search Permits
11,778 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 ton horizontal gas
Replacement of complete existing central heat and air system with or without duct work HVAC changeout: replace existing 4-ton horizontal gas split system (furnace coil condenser) like-for-like; no structural change.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton 2 Stage Vertical Heat Pump (1812 West 35th Street 78703)
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton horizontal gas system (Unit B)
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 ton vertical heat pump
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 ton two stage horizontal gas system
ePlan: Commercial Expedited Review - First Time Finish Out for Restaurant (958 SF).
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 4 ton vertical gas 2-stage (upstairs)
mechanical_permit_(r)
mechanical
mechanical
mechanical
mechanical
mechanical
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL NEW MECHANICAL EQUIPMENTS ON ROOF
Installation of a temporary vertical netting per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Fit out of tenant suite on partial for 6th floor as PER PLAN CHANGES. No change in use, egress or occupancy.
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY BARRICADE AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
installation of TEMPORARY SITE SPECIFIC engineer enclosure system netting on scaffolding. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INTERIOR RENOVATION FOR ONE FAMILY DWELLING HOUSE. NO CHANGE IN USE OF EGRESS & OCCUPANCY.
FILE INTERIOR RENOVATION WORK AT EXISTING 1-FAMILY BUILDING TO REMOVE PARTITIONS, REPLACE WINDOWS, INSTALL NEW PARTITIONS, DOORS, AND PAINT. ALSO MECHANICAL WORK OF SPLIT AC SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL WORK TAKING PLACE ON THE 52ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Filing herewith for two 30-ton energy recovery chillers and repurpose 170-ton Dry Cooler
Installation of mechanical units as shown on plans filed herewith.
Mechanical renovation of the 1st floor for office build out. No change in use, egress or occupancy