Sewer line replacement in the yard from clean out to the tap connection total length of 30 feet.
2458AL NEW 2 STORY 3 BEDROOM 2 1/2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH
Installation of customer supplied pressure reducing valve dual union with an offset increasing in size from three-quarter inch to 1 inch PVC as well as an expansion tank.
replace yard water line and yard gas line
ePlan: Residential Expedited Review - New Construction of a 2-Story Single Family Res. [4bed 3.5bath] with attached garage
ePlan: Residential Expedited Review - New construction of a 2-Story Single-Family Res. [4bed 4.5bath] with attached Garage and attached Carport
Replacement of an existing water heater swapping out tank electric water heater for a similar model
ePlan: Residential Expedited Review - New Autofill/Heated pool w/Spa
Express: Replace windowsdoors s4s.Gut kitchen&baths&all drywallinsulation as needed.New HVAC&ductwork.New elec fixtures & subpanel and main panel if needed.New plumbing fixtures. No walls or plumbing moving
Pool - inground pool Revision 1 to auto-filler and heater
Total demo of SFR 1680 sq ft circa 1963 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
40gal gas tank located in the garage PRV install in the yard
Replacement of an existing water heater 50gal electric tank located in a closet
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Habitable Attic and Attached Garage.
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [2bed 2bath] Work to include: First floor addition and interior remodel adding 1bath
Harrison S356 D Right New - 2 Story SFR w/ 5 bedrooms 3 bathrooms attached 2 car garage covered entry porch and patio required parking: 2.
15 Interior trench thru slab for bathroom addition at front left of home for shower toilet and lavatory drain addition
Removal and disposal of existing pipe Installation of properly sloped and sized PVC drain lines Per contractor The drain pipes are under the foundation and through the yard. There will be no drywall cut on the inside of the home either. (6/10/26)
Interior remodel of two story residence with three bedrooms: Reconfigure bedrooms office laundry bathrooms kitchen and dining. Remove 1 bedroom on first floor and add bedroom on second floor. New windows.
Installing a gas line to a permanent generator
Replacement of an existing water heater Remove and replace Water Heater - 40 gal Gas
Tunnel 20 feet under the house from lift station. Fix break and bellies in line. Install 35 feet of new sewer yard line with schedule 40 PVC
ePlan: Residential Expedited Review - New Autofill/Heated Pool
Interior remodel siding and window replacement interior finishes replaced den will be made into a bedroom half bath added kitchen remodeled primary bed and bath modified relocating walls and plumbing fixtures HVAC system replaced
Excavate 52 trench to repair main drain line in the yard
Total demo of SFR 768 sq ft circa 1951 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolition webpage.***
ePlan: Residential Expedited Review - New Autofill/Heated pool w/Spa.
Peform and Air test on an existing gas line.
Replacement of an existing water heater swapping out electric tank water heater for similar model.
QT - small interior remodel - selective demolition construction of new partitions ceilings mechanical electrical and plumbing as indicated on drawings at existing office space - OVA