Search Permits
11,778 results · type: mechanical
INSTALLATION OF TEMPORARY RAMP AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
TEMPORARY DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Direct replacement of air conditioning units in the cellar MER. All existing ductwork to remain. No change in egress and occupancy.
Installation of a temporary Plywood Enclosure per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Modify the existing HVAC system serving on 30th floor. No change in use, egress or occupancy. Proskauer pilot build out.
INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE 2022. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Installation of a temporary roof protection, overhead protection and window protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application
Fling herewith drawings indicating mechanical work on 17th floor. No change to use, egress or occupancy.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY BARRICADE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
INSTALLATION OF SPLIT HEAT PUMP SYSTEM, KITCHEN AND BATHROOM EXHAUSTS, RELATED TO THE CELLAR APARTMENT. NO CHANGE OF USE, EGRESS OR OCCUPANCY THRU THIS APPLICATION. MAIN OT APPLICATION IS COVERING THE CHANGE OF USE.
INSTALLATION AND USE OF TEMPORARY EXTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Mechanical work associated with new building construction. NB filed under B01085790-I1.
EXISTING 2 FAMILY BUILDING WITH MECHANICAL WORK AT CELLAR,BASEMENT,1ST,2ND AND 3RD FLOOR.JOB FILED TO RELATED TO ALT2 APPLICATION#b01439947-I1.NO CHANGE IN USE,MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
Mechanical work related to tenant fit-out for Wingstop restaurant at this location. No change in use, egress, or occupancy under this application.
Filing for the installation of new diesel indoor generator with rooftop radiators, air intakes, exhaust, HVAC air distribution systems and relocation of existing duct work and piping
REMOVAL AND INSTALLATION OF DUCTWORK, DIFFUSERS, FANS, AND RELATED MECHANICAL PIPING AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS
MECHANICAL MODIFICATIONS TAKING PLACE ON THE 11TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRES OR OCCUPANCY.
FILE GENERAL CONSTRUCTION WORK OF PROPOSED TAKE OUT STORE WITH NEW INTERIOR PARTITIONS, FLOOR TILES, NEW HARD CEILING, PAINTING AND MECHANICAL WORK OF NEW KITCHEN HOOD WITH EXHAUST SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Mechanical work on the 28th floor construction (29th floor marketing) as indicated on drawings.
MECHANICAL WORK AS PER THE PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
SUBSEQUENT MECHANICAL APPLICATION IN CONJUNCTION WITH APPROVED GC #B01194689-I1
Replacement of complete existing central heat and air system with or without duct work hvac change out
Install 12k carrier highwall mini-split system
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1602
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 ton vertical gas