Search Permits
2,737 results · type: residential
RESIDENTIAL - FAU AND AC CHANGE OUT
ELECTRICAL VEHICLE CHARGING STATION
This project consists of a 353-unit multi-family development comprising of (1) 4-story and (6) 2 story carriage houses. BLDG 1: New 4-story, type V-A construction, 406,857 SF, group R-2 occupancy, 341-unit Multifamily building with 2hr fire rated wall to separate building into (5) separate areas. Special inspection required for steel, concrete, masonry, soils, Fire-resistant Penetrations & Joints, Mastic and Intumescent Fire-resistant coatings and elect equip 1000amps. Special Inspections Requ
This project consists of a 353-unit multi-family development comprising of (1) 4-story and (6) 2 story carriage houses. BLDG 3: New 2-story, type V-B construction, 5,001 SF, group R-2 and U occupancy, 2 unit apartment house over parking garage. Special inspection required for steel, concrete, masonry, soils, Fire-resistant Penetrations & Joints, Mastic and Intumescent Fire-resistant coatings and elect equip 1000amps. Special Inspections Required Emergency Responder Radio Coverage IFC 510. Defe
This project consists of a 353-unit multi-family development comprising of (1) 4-story and (6) 2 story carriage houses. Medina Station, Carriage House - New Build BLDG 7 BLDG 7: New 2-story, type V-B construction, 5,472 SF, group R-2 and U occupancy, 2 unit apartment house over parking garage. Special inspection required for steel, concrete, masonry, soils, Fire-resistant Penetrations & Joints, Mastic and Intumescent Fire-resistant coatings and elect equip 1000amps. Special Inspections Require
This project consists of a 353-unit multi-family development comprising of (1) 4-story and (6) 2 story carriage houses. BLDG 4: New 2-story, type V-B construction, 5,001 SF, group R-2 and U occupancy, 2 unit apartment house over parking garage. Special inspection required for steel, concrete, masonry, soils, Fire-resistant Penetrations & Joints, Mastic and Intumescent Fire-resistant coatings and elect equip 1000amps. Special Inspections Required Emergency Responder Radio Coverage IFC 510. Defe
This project consists of a 353-unit multi-family development comprising of (1) 4-story and (6) 2 story carriage houses. BLDG 5: New 2-story, type V-B construction, 5,001 SF, group R-2 and U occupancy, 2 unit apartment house over parking garage. Special inspection required for steel, concrete, masonry, soils, Fire-resistant Penetrations & Joints, Mastic and Intumescent Fire-resistant coatings and elect equip 1000amps. Special Inspections Required Emergency Responder Radio Coverage IFC 510. Defer
This project consists of a 353-unit multi-family development comprising of (1) 4-story and (6) 2 story carriage houses. BLDG 6: New 2-story, type V-B construction, 5,001 SF, group R-2 and U occupancy, 2 unit apartment house over parking garage. Special inspection required for steel, concrete, masonry, soils, Fire-resistant Penetrations & Joints, Mastic and Intumescent Fire-resistant coatings and elect equip 1000amps. Special Inspections Required Emergency Responder Radio Coverage IFC 510. Defe
This project consists of a 353-unit multi-family development comprising of (1) 4-story and (6) 2 story carriage houses. BLDG 2: New 2-story, type V-B construction, 5,001 SF, group R-2 and U occupancy, 2 unit apartment house over parking garage. Special inspection required for steel, concrete, masonry, soils, Fire-resistant Penetrations & Joints, Mastic and Intumescent Fire-resistant coatings and elect equip 1000amps. Special Inspections Required Emergency Responder Radio Coverage IFC 510. Defe
New development of a 118,302 SF, 161 unit, 6-story mix-use building comprising of 5-story type III-B construction apartment units above a 1-story type I-A construction parking garage with commercial space. Special inspections req. - Steel, concrete, wood, soils. Mastic and intumescent fire-resistant coatings, fire-resistant penetration & joints and Electrical equipment rated at or above 1,000 amps. Special inspection for Emergency Responder Radio Coverage. Deferred fire sprinklers, fire alarm, a
Replace the existing roof to the fortified standard PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded to the pe
re-roof PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded to the permit, please email inspections@nola.gov req
re roof PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 GEO-TAGGED PHOTOS (ONE FROM EACH SIDE) SHOWING: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded to the permit, please email inspections@nola.gov r
Remove and replace shingles on a single family home to fortified standards. *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
Fortified Roof Replacement *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
we are replacing the shingles on this roof just on the main structure. *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
Scope of Work: Shingle Roof Replacement on House: Remove, haul and dispose of existing asphalt roof shingles. *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
Reroof permit for LDI grant program *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
remove existing roof and install fortified roof PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded to the permit
reroof
New Construction
Addition and/or Alteration
New Construction
Make Safe Permit For RP
Addition and/or Alteration
Make Safe Permit For RP
New Construction
New Construction
New Construction
Addition and/or Alteration