Search Permits
7,080 results · type: mechanical
BLDG 19 - UNIT C (UNIT 1011 - 1021 1047 - 1052) WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 3
261 Square Foot Bathroom Addition to the Rear Bedroom with Shower Tub Separate Toilet Double Vanity Closet and Washer/Dryer.
BLDG 18 - UNIT C (UNIT 1011 - 1021 1047 - 1052) WILL HAVE A 2-CAR GARAGE 3 BEDROOMS 3 FULL BATHROOMS 1 HALF BATH AND A BALCONY.
Replacement of complete existing central heat and air system with or without duct work
UNIT D - 1041 - WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3.5BATHROOMS AND A BALCONY.
Construction of structural towers attached to main terminal building stairwells and light poles to allow camera installation for Virtual Ramp Control System. Work proposed in electrical rooms IT rooms etc. with new conduits/circuits (power and signal) being run from those rooms. Mechanical work proposes installation of compressor systems that go with the camera houses. These are dedicated systems that SAAB maintains and do not connect to any HVAC or other airport mechanical systems. Infrastructu
Replacement of complete existing central heat and air system with or without duct work Replace hvac system replace 3 ducts
Replacement of complete existing central heat and air system with or without duct work
I am the contractor taking over this job.This is for a final inspection. Scope of Work: Install 4-ton condenser and 10kw heat strip.
Gas leak repair and gas perimeter get gas back on
Meter Increase for 2- gas furnace, 1- tankless water heater, 1-clothes dryer, 1- 5 burner stove top, 2- gas lanterns on front porch
mechanical
mechanical
mechanical
mechanical
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY DEBRIS CHUTE AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY NETTING SYSTEM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF SINGLE PERSONNEL HOIST IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
The scope of work consists of installing new commercial hood and equipment, new toilet with new finishes. Build new mezzanine for dining and stair from ground to mezzanine.
INSTALLATION OF NEW HVAC SYSTEM ASSOCIATED WITHNB APPLICATION FILED UNDER INITIAL FILING
INSTALL NEW MECHANICAL HOOD, DUCTS, AND EXHAUST FAN AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Provide HVAC on the 12 floor in conjunction with Alt #M01405377 as per plans filed