Search Permits
18,449 results · type: plumbing
NEW GAS LINE FROM EXISTING GAS METER. NEW GAS CONNECTION TO REPLACEMENT BURNER FROM EXISTING GAS METER
RENOVATION OF EXISTING CELLAR AND 1ST FLOOR WITH PLUMBING WORK: REPLACE KITCHEN AND BATHROOM FIXTURES ON 1ST FLOOR; REPLACE 2-PC RESTROOM, WASHER,DRYER AND NEW BOILER AND HOT WATER HEATER ON CELLAR; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICAT
PLUMBING WORK OF EXISTING 3-FAMILY BUILDING AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Install new sinks in he adult day care center on the 2nd floor. No change to use, egress or occupancy.
PLUMBING WORK TO REPLACE (1) EXIST BOILER & (1) EXIST HWH, & INSTALL (1) ADDITIONAL NEW BOILER & (1) ADDITIONAL NEW HWH AT CELLAR. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q01453891
Repairing broken cast iron sewer line / tunneling
124 tunnel below the foundation to replace entire PVC drain system. 3 access holes - right front left
Bldg #3 New 2-story dwelling unit 2 bed/2.5 bath with attached carport porch balcony
Replace water heater with tankless water heater
Interior remodel of existing retail space #132.
Replacement of an existing water heater UNIT # 8104
Replacement of an existing water heater replace water heater
Interior renovation of an existing laundromat. Will remain laundromat.
Replace approximately 50 of Orangeberg piping in sewer yard line from 4 PVC two way cleanout to about 10 from Street
Irrigation System for the Front and Back Yards at 6700 Vine Street
PUD New SFR 1 - Story 3-bedroom 2 baths with attached 2-car garage covered front porch and covered rear patio
Replacement of an existing water heater 50gal gas tank
Reroute all of the hot and cold water lines overhead in the attic. Abandon the water lines in the foundation. Several access holes will be necessary. Estimate does not include any cosmetic repairs. Does not include the main water lines in the yard between the house and the water meter. Does not include replacement of fixtures.
Add 1540 Sqft 2nd story addition consisting of 2 new bedrooms 2 full bathrooms an office and media room. Existing 1st floor renovation includes new flooring refurbished shower tile surrounds primary bath and 2 bath Tub to shower conversion at 2nd bath.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [1bed 1.5bath] with attached garage. Work to include Open pavilion and outdoor kitchen. See also 1st. floor gym / game room.
Replacement of an existing water heater 40gal gas tank located in the garage
Bathroom addition to existing 1-story single family residence. New bath includes 2 sinks 1 wc 1 shower new windows new framing new siding new foundation and roof. 3 bed/2 bath
Install Sprinkler System
New construction 2-unit use 2-story single-family residential to include: 1st story 1-car garage with office space; 2nd story to include: exterior access stairs studio space with kitchen and full bath.
Interior Remodel on 4-plex
Installing New Irrigation System
ETJ- Replacement of an existing water heater 50gal gas tank located by the kitchen area
Installing like/like G water heater
ePlan: Residential Expedited Review - New Accessory to Primary [1bed 1bath]