Search Permits
7,080 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work replacement of hvac system
Replacement of complete existing central heat and air system with or without duct work 3.5TON CARRIER
Replacement of complete existing central heat and air system with or without duct work
Interior remodel
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 1
*Partial Demo* Addition/remodel to SFR Enclose rear covered porch to create mudroom new screen porch and expired permit work 2012 058357 EP and 2017-138089 PP
Replacement of complete existing central heat and air system with or without duct work Scott Wilson: replacement of 4T horizontal like-for-like gas system
Replacement of complete existing central heat and air system with or without duct work
New single-story SFR (4br/2ba) with attached garage covered patio and covered porch EV charger is not optional. It is required per IECC 2024.
ePlan: Residential Expedited Review - New construction of a 2-Story Small Lot Single Family Res. [3bed 3.5bath] with Attached Carport.
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [4bed 3.5bath] with Attached Carport. Bldg 2
New construction single-family residential 1-story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio.
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A582 New 2 story attached unit with 2 bedrooms 2.5 bathrooms and a 2 car garage.
Replacement of complete existing central heat and air system with or without duct work replacement of hvac system
Replacement of complete existing central heat and air system with or without duct work change out
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 Ton Gas Vertical
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A581 New 2 story attached unit with 3 bedrooms 2.5 bathrooms and a 2 car garage.
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Phase 1 - involves demolition of existing Perfect Strangers (restaurant) vestibule and bar services areas.
New single-story SFR (4br/3ba) with attached garage covered patio and covered porch *PRODUCTION BUILDER- GREEN BUILDING*
BLDG 30 - UNIT B (UNIT 1042) WILL HAVE A 1 CAR GARAGE 1 CARPORT 3 BEDROOMS 2 FULL BATHROOMS AND A HALF BATH.
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [5bed 5bath] with Office Attached Garage.
BLDG 29 - UNIT D 1040 WILL HAVE A 2 CAR GARAGE 3 BEDROOMS 3.5BATHROOMS AND A BALCONY.
Replacement of complete existing central heat and air system with or without duct work
7 DAY - Interior alteration of an existing office space - OVA
Replacement of complete existing central heat and air system with or without duct work Johnny Ray
Replacement of complete existing central heat and air system with or without duct work *Shari Curtis: Replace existing 3.5-ton horizontal gas HVAC system like-for-like; no structural change.
Replacement of condenser only 37 PALMA
Plan: Commercial Expedited Review - [APPROVED] Interior Finish out of Shell Building to Create Restaurant (2162SF).
This project includes renovations to the hotel level 1 lobby/restaurant and hotel level 7 pool deck areas. Work will be split into phases to keep life safety systems for both areas of the renovation intact. Level 7 - will include replacement of Pool FF&E upgrades to existing bar finishes reconfigure of existing pool glass railing and replacement of exterior cabanas.