Search Permits
1,190 results · type: roofing
Roofing
Roofing
re-roof with new Fortified roof system *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
re-roof with new Fortified roof system *PHOTOS REQUIRED* 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure.
re-roof with new Fortified roofing system Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Remove and replace existing roof system. Install new roofing materials in compliance with current building code and FORTIFIED Roof™ standards.
Remove existing roofing system down to deck. Inspect and replace any damaged or deteriorated roof decking as needed. Install a continuous sealed roof deck system in accordance with IBHS FORTIFIED Roof™ standards. Apply approved underlayment, starter strip, and install new asphalt shingles per manufacturer specifications. Install proper flashing at all penetrations, valleys, walls, and roof transitions. Install ridge cap and provide proper attic ventilation (or sealed attic assembly if applicable
Remove existing roofing material, inspect decking, replace anything damaged or rotted. Install new fortified roofing system up to IBHS FORTIFIED standards and codes.
Fortified Roof Replacement PLEASE NOTE: Re-roofing permits DO NOT require an inspection from Safety and Permits, instead please upload the following photos to this permit PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels Once all applicable photos have been uploaded to the permit, please email ins
Re-roof entire structure Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Residential reroof only; no structural changes. Remove existing shingles. Replace planned 9 sheets of 1/2" CDX. Install Owens Corning Oakridge shingles.
Fortified Roof Replacement Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
Remove and dispose of the existing roofing system. Remove and replace twenty-one (21) roof sheathing panels as required to provide a structurally sound substrate for installation of the new roofing system. Install new vapor barrier batt insulation 6.6" PolyISO insulation to achieve R-38 1/2" DensDeck cover board and a new mechanically attached 60-mil MuleHide TPO roofing system. Replace the existing through-wall scupper and install new metal coping to complete the roofing assembly.
Roofing
Roofing
Roofing
RE-Roof Once all applicable photos have been uploaded, please email Inspections@nola.gov requesting permit closure. PHOTOS REQUIRED 4 geotagged photos (one from each side) showing: Removal of existing roof material Installation of water intrusion resistant underlayment Installation of the drip-edge and flashing Installation of shingles or metal panels
TPO overlay scope for 2501 Elliot/11 Vine Street that removes selected existing flashing and metal components installs a mechanically attached 1/2" cover board and applies one layer of 60 mil Firestone TPO with perimeter wind-rated fastening. It also includes new factory accessories Kynar-coated sheet metal coping metal storm collar sealant replacement and both a 20-year manufacturer warranty and a 2-year workmanship warranty.
Roofing
Roofing
Roofing
Roofing
Roofing
Roofing
King County WTD proposes to demo the existing roof system and replace with built-up roofing including but not limited to the insulation system equipment curb flashing pipe penetration flashing coping drain extensions fall arrest roof anchors and gutter system. Remove and reinstall existing rooftop fans and vents to facilitate demolition and installation of roofing system and extend conduit as necessary to accommodate new roof height due to additional insulation.
The scope describes a recover of the existing roof: removal of failing flashings and metals localized repairs installation of new coverboard and a fully adhered 60?mil Carlisle TPO fleece?back system with new metal trims and sealants.
Fleeceback TPO membrane roof overlay over original asphalt roof.
Roof overlay with new 60mil fleeceback membrane
Roofing
Roofing