Search Permits
2,926 results · type: commercial
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
New EV charger and associated electrical equipment with 2 new parking stalls (1 ADA) at existing gas station. New 400A 3 phase electrical meter. Installation of landscape shrubs in front of new transformer. Results in CoC.
(4) new padel ball courts with corresponding enclosures, prefabricated container office, and prefabricated handicap restroom. Type V-B construction and group A-5 occupancy, 15,497 SF. New electrical meter and 1 inch water meter. Code Modification PMT25-19333. Special Inspection for concrete construction. Results in CoO.
Remove existing equipment and replace with new on existing cell tower site. Modification to mount required per engineer's report. Must comply with all stipulations listed on the approval administrative letter ADM25-00745. Must provide copy for inspector on site. Results in CoC.
Third-Floor Elevator Lobby and Corridor demo and remodel, mechanical, electrical, and finishes. No structural or plumbing. Deferred fire sprinklers, fire alarm and access control. Results in CoC.
Addition and/or Alteration
Addition and/or Alteration
New Construction
New Construction
Addition and/or Alteration
Addition and/or Alteration
New Construction
New Construction
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
Addition and/or Alteration
New Construction
TENANT IMPROVEMENTS
STORAGE RACKS
Installing two boilers at the Shepherd Aquatics Complex. With this installation, three VFDs and a UPS will be relocated. Special inspection for concrete, post-installed anchors. Approved as noted. Results in CoC.
Temporary power connection with maintenance receptacle and job trailer. Any additional electrical loads on the panel is not permitted, as sufficient information was not provided during the permit review to evaluate these items for compliance. New electric meter. Results in CoC.
To get power on in unit 2042