Search Permits
7,080 results · type: mechanical
New Construction
Addition and/or Alterations
New Construction
Addition and/or Alterations
Addition and/or Alterations
Replacement of complete existing central heat and air system with or without duct work
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
Interior Finish Out to create a Medical Office
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A581 New 2 story attached unit with 3 bedrooms 2.5 bathrooms and a 2 car garage.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Third floor unit.
*Green Building* New 2-story 3 bedroom 2.5 bathroom single family residence with attached garage covered front porch and rear covered patio.
Replacement of any self-contained packaged units Replacement of 2x like-for-like Lennox 7.5 Ton rooftop units at Champion Performance.
Replacement of complete existing central heat and air system with or without duct work
Replacement of any self-contained packaged units Replacement of 1x like-for-like 17.5-Ton RTU.
Replacement of complete existing central heat and air system with or without duct work 1 system: YORK SIDE DISCHARGE 4-5 TON 19 SEER2 DUAL FUEL gas required
Replacement of complete existing central heat and air system with or without duct work
Interior remodel of kitchen/bathrooms/utility space
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work HVAC Changeout/Alteration: Replace and install 3 ton heat pump and air handler like-for-like no structural change.
Replacement of complete existing central heat and air system with or without duct work
ePlan: Expedited Review - New Construction 2 Unit / 3 level Multi-Family Res. (BLDG 1 - 7488 sf.) *REVIEWED PER IBC*
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A581 New 2 story attached unit with 3 bedrooms 2.5 bathrooms and a 2 car garage.
New Construction 2 Story SFR with attached garage and covered porch and patio- 4bed 3.5bath.
Replacement of any self-contained packaged units Replacement of 1x 7.5 Ton RTU at 1835A Kramer Lane Suite 100. This is not a duplicate permit request. Weve done other work at this location in the past.
Interior remodel see notes attached Dryer vent and exhaust fan in bathroom to be included in scope of work for MP.
ePlan: Residential Expedited Review - SITE PLAN APPROVED: PHASE A - Greystar Plan A581 New 2 story attached unit with 3 bedrooms 2.5 bathrooms and a 2 car garage.
Replacement of any self-contained packaged units REMOVE & REPLACE LOBBY RTU WITH LIKE FOR LIKE * POPEYES
Replacement of complete existing central heat and air system with or without duct work replacement of hvac system