Search Permits
11,763 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work 4 TON CONDENSER CHANGEOUT WITH INDOOR COIL PLUS 88K BTUS FURNACE CHANGEOUT
Replace 29 existing RTUs with like-for-like units. New controls for BAS
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Summit 2979-TR201-L New 2-Story Single Family Residence with (4) bedrooms (3) bathrooms Attached Garage Covered Patio & Porch Cafe Pocket Office & Loft
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
INTERIOR REMODEL PHASE 2 OF EXISTING OFFICE SPACE
Replacement of any self-contained packaged units
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Replacement of HVAC system.
ePlan: Commercial Expedited Review - New Construction of an Elementary School on Existing Site. Building to include 1 story and 3 story Portions. (94951 SF)
New 2-story single family residence 4 bed/4.5 baths with attached covered parking covered porch and covered patio Green Building
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system and ductwork
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work HVAC change out
ePlan: Residential Expedited Review - New construction of a 2-Story Duplex [1bed 1bath] over Attached Garage. Unit B
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
mechanical
mechanical
mechanical
mechanical
mechanical
EQUIPMENT USE: DUAL 6548 # CAPACITY PERSONNEL HOISTS DURING BLDG ALTERATION, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY.
installation of temporary overhead protection. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Installation and use of temporary Building Maintenance Unit (BMU) construction equipment as per plans filed herewith.
MECHANICAL MODIFICATIONS (GARAGE Store - Space 2058) AS INDICATED ON PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Filing for mechanical work at the 22nd flr (23rd Marketing) and 23rd flr (24th Marketing). No change is use, egress or occupancy.