Search Permits
11,760 results · type: mechanical
1702AR NEW 1 STORY 4 BEDROOM 2 BATH SINGLE FAMILY RESIDENTIAL HOME WITH ATTACHED GARAGE COVERED FRONT PORCH AND REAR PATIO
Replacing 2 Furnaces
Replacement of complete existing central heat and air system with or without duct work
New single-family residence - 4 bed/2.5 bath 2520 living area with attached garage
Replacement of complete existing central heat and air system with or without duct work HVAC Replacement 1 for 1
Replacement of complete existing central heat and air system with or without duct work
9667 SF Interior fit out for a non procedural facility. Scope includes the construction of new non load bearing partitions for new private offices break room waiting area reception and restroom. Finishes and MEP work to accommodate new work.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
New 3-story 3 bedroom 3 bathroom (2 full 2 half) single family condo residence with attached garage covered front porch rear covered patio and 2nd floor covered screened balcony.
Replacement of complete existing central heat and air system with or without duct work
Interior Non-Structural Finish Out [10 Day Review]
Interior remodel admin areas at existing telecom facility - lighting and HVAC only.
mechanical
mechanical
mechanical
Proposed temporary installation of contractor shed/ shanty as per BC 3303.16 to be used as temporary office during construction of # M01244073-I1. No change in use, egress and/or occupancy with this application.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGES IN USE, EGRESS, OR OCCUPANCY
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Installation of temporary Site Specific Engineered Enclosure System per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION AND USE OF TEMPORARY LOADING PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Replacement of air conditioning unit on the roof. All existing ductwork to remain as is. No change in use egress and occupancy.
INSTALLATION AND USE OF TEMPORARY LOADING PLATFORM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION AND USE OF TEMPORARY INTERIOR CLIMBING PLATFORMS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Mechanical demolition to existing duct/piping and HVAC as per plans filed herewith. No change to use, egress, or occupancy
Use of knuckleboom temporary construction equipment as per plans filed herewith. This application is filed in conjunction with NB B00975270-I1.
INSTALLATION AND USE OF TEMPORARY KNUCKLEBOOM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
DIRECT REPLACEMENT OF PACKAGE ROOFTOP UNIT.