Search Permits
11,623 results · type: electrical
SOLAR PV WITH ESS
ELECTRICAL VEHICLE CHARGING STATION
PANEL UPGRADE SAME LOCATION
PANEL UPGRADE SAME LOCATION
SOLAR PV WITH ESS
PANEL UPGRADE SAME LOCATION
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY AND EXPANSION PACK. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY
PERMIT IS ONLY FOR INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEES AN
PERMIT IS ONLY FOR UPGRADE TO A 200A SERVICE AND INSTALLATION OF THREE SOLAREDGE BATTERIES. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOP
PERMIT IS ONLY FOR THE INSTALLATION OF ONE TESLA POWERWALL3 BATTERY. ALL WORK TO BE PERFORMED PER 2024 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO YOUR SCOPE OF WORK. FAILURE TO SCHEDULE DISCONNECT MAY RESULT IN ADDITIONAL UTILITY TRIP CHARGE FEE
PERMIT IS ONLY FOR AN UPGRADE TO A 225AMP SERVICE AND THE INSTALLATION OF ONE SOLAREDGE HOME BATTERY. B.E.S.S. SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 70 PER R327.4. ALL WORK TO BE PERFORMED PER 2018 IRC, MANUFACTURE’S INSTALLATION INSTRUCTIONS AND SERVICE UTILITY PROVIDER SPECIFICATIONS. PERMIT DOES NOT INCLUDE PHOTOVOLTAIC SYSTEM INSTALLATION. DO NOT DISCONNECT UTILITY WIRES OR METERS. SCHEDULE DISCONNECT/RECONNECT WITH THE SERVING UTILITY AND OBTAIN UTILITY SERVICE REQUIREMENTS SPECIFIC TO
South pedestal replacement. Removing the existing 150 amp pedestal and installing a new 200 amp pedestal 18-in away from current location per SRP at existing mobile home.
200 AMP to 400 AMP service upgrade. (1) new electric meter. Reviewed as noted. Results in CoC.
Electrical vacancy
New wiring to NEC code with 200 amp service
New wiring 200 amp service
6 month vacancy, add 2nd ground and replace missing outlet and switch plates
File permit application for 6 month vacancy 1510 Foy St Apt 5032
Six-month vacancy inspection. Edgar Young 813-0256. 1319 Burgundy St Apt 301
Six-month vacancy inspection. Edgar Young 813-0256 1319 Burgundy St Apt 201
Emergency repair. Damaged neutral lug on main breaker. Need Emergency disconnect and reconnecting of service .
Install subpanel off of of Main House Panel, installed 3 new circuits for Swimming Pool
Install required conduit and wiring for installation of four light fixtures on the underside of the 2nd floor balcony.
Replace meter pan
Replace 225 amp panel disconnect with main lug feed through panel
Vacancy
We're moving this meter so we will need a disconnect and reconnect to power. We need to remove the existing meter can and disconnect and install it on a HFrame.
We're moving this meter so we will need a disconnect then reconnect.
Completely re-wire. Install a new 200 amp meter & 24 circuits panels. New switches, receptacles and lights.
Completely re-wire. New 100 amp meter & 18 circuits panel. New switches, receptacles and lights.