Search Permits
7,080 results · type: mechanical
AC UNITS TO BE REFURBISHED & REBUILT.HUMIDIFIERS TO BE REMOVED & REPLACED ON THE 5TH FL.GAS BOILER AND ASSOCIATED PIPING TO BE REMOVED. PIPING AND ELECTRIC BOILER TO BE RECONNECTED.BASE BUILDING HOT WATER PUMPS TO BE ADDED WITH ALL NECESSARY PIPING SUBCEL
Northwell LIJ Medical Center - Bone Marrow Transplant (BMT) Project: modify Mechanical systems to conform with new layouts for new hospital program, as per plans filed herewith.
PROPOSED HORIZONTAL AND VERTICAL ENLARGEMENT TO AN EXISTING ONE FAMILY DWELLING ALONG WITH INTERIOR RENOVATION.
Installation of split system cooling and supplemental heating.
Modifications to the existing HVAC System: Installation of new supplemental AC Unit, ductwork, controls on the 28th Floor as per plans (Dechert LLP - Supplemental AC Unit.) No change to use, egress or occupancy.
Northwell Health LIJ Medical Center: Installation of Mechanical Systems for new three-story Behavioral Health Pavilion (BHP 2) on private hospital property, as per plans filed herewith.
Replacement AC and Ventilation Units with Associated Piping, installation of a new tempered heat pump. No change in egress, use, zoning or occupancy.
DIRECT REPLACEMENT OF SPLIT AIR CONDITIONING SYSTEM. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
MECHANICAL SYSTEMS MODIFICATION ON THE 11th FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
MODIFICATION TO EXSITING MECHANICAL SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY/
INSTALL DEBRIS CHUTE AS PER PLAN IN CONJUNCTION WITH BUILDING DEMOLITION
INSTALL DEBRIS CHUTE AS PER PLAN IN CONJUNCTION WITH BUILDING DEMOLITION
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
This MS filing is to supersede the old BIS job# 402250407 and remove the abandoned HVAC rooftop unit including its ductwork and the related support. Remove ECB violation 34630799H. No change in use, egress or occupancy..
Mechanical work as shown on plans filed herewith. No change in use, egress or occupancy.
Provide indoor fan coil unit to serve the new multi-purpose room (educational use) and existing adjacent classroom.
Remove Existing Air Conditioning Unit & Associated Ductwork, Install Air Conditioning Ductwork, Supply Air Diffusers, Return Air Grilles and Volume Dampers on Part of the 40th Floor (Suite 4000)
SUBSEQUENT FILING OF MECHANICAL WORK AS PART OF THE ALTERATION OF EXISTING DWELLING UNIT PH-14E. NO CHANGE TO USE, EGRESS OR OCCUPANCY
Installing 6 ton condenser and 4 air handlers with related piping and duct work.
Direct replacement of two rooftop HVAC package units
New Construction
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
New Construction
Addition and/or Alterations
Addition and/or Alterations
Addition and/or Alterations
New Construction
Addition and/or Alterations