Search Permits
11,760 results · type: mechanical
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system.
Tenant Finish Out -Divide Floor 10 into 7 Spec Suites
Replacement of complete existing central heat and air system with or without duct work Replacement of Heat Pump Complete System. NO Ducting
Renovation of existing school building for the purpose of a daycare facility. Scope of work includes Architectural facade; Interior modifications additional (900 SF) new classroom building; Full HVAC refurbishment. [Bldg. B]
Highland 3313 A Right New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 686.14 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 21-10 Actual Bld height: 21-10 required parking: 2.
New construction of a 2-story single family dwelling in a condo regime. Both units are part of the duplex. Both units have 3 bedroom 2.5 bath with 2 car garage.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system through Austin Energys Weatherization Assistance program.
Interior Remodel- Demo of level one interior space. Reconfiguration of level 1 floorplan with new walls cabinetry and finishes. Replacement windows and doors to match existing sizes/shapes.
*Partial Demo* Interior remodel
Replacement of complete existing central heat and air system with or without duct work
mechanical
mechanical
mechanical
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
INSTALLATION OF OVERHEAD PROTECTION AND ROOF PROTECTION AT ADJACENT BUILDING AS SHOW HEREIN IN CONJUNCTION WITH FACADE JOB# M01355711. NO CHANGE IN USE EGRESS OR OCCUPACNY. WE SHALL COMPLY WITH CHOATER 33 OF 2022 B.C
Installation Of Temporary Single Personnel Hoist As per Plans Submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
INSTALLATION OF OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF BETA MAX MATERIAL HOIST AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
MECHANICAL SYSTEMS APPLICATION FILED HEREWITH IN CONJUNCTION TO ALT-CO APPLICATION X01349818-I1
INTERIOR & EXTERIOR RENOVATION OF AN EXISTING 2 FAMILY HOUSE WITH , REPAIRING FLOOR, CEILING, STAIR, NEW PARTITION, PAINTING , REPLACE WINDOWS, DOORS , REPLACE FRONT STAIR, INSTALL NEW AC UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALL NEW EXHAUST VENTS AND AIR INTAKE VENTS FOR THE FOUR (4) REPLACEMENT DIRECT-VENT GAS-FIRED HOT WATER HEATERS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF 6000 LB SINGLE PERSONNEL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
INSTALLATION OF DEBRIS CHUTE AT 400 PENNSYLVANIA AVENUE - BROOKLYN, AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. THIS JOB IS IN RELATION TO DOB JOB # B00952504.
Mechanical modifications for Interior Demolition as per plans filed herewith. No change to use, egress or occupancy.
mechanical means to assist with demolition on grade, and chute will be used to lower debris from floor to floor
Mechanical means to assist with demolition, and chute will be used to lower debris from floor to floor.
Mechanical work for electrical split air-conditioning units on 1st wall. No change in use, occupancy or exit.