Search Permits
11,760 results · type: mechanical
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF A TEMPORARY NEEDLE BEAM SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NEEDLE BEAM SCAFFOLD TO COMPLY WITH 2022 NYC BUILDING CODE, CHAPTER 33.
TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. OVERHEAD PROTECTION SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2022 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
INSTALLATION OF TEMPORARY PERSONNEL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.
INSTALLATION OF TEMPORARY WORKING PLATFORM AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Proposed to convert existing 3 story building from mixed use to 3 dwelling units. General construction and mechanical work as per plan submitted. No change in bulk. Obtain a new C of O.
INSTALLATION OF 6000 LB SINGLE PERSONNEL HOIST CAR AS PER PLANS DURING CONSTRUCTION. HOIST SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Installation of a new HVAC system on the 22nd floor (Newrez) as per plans. No change to use, egress or occupancy.
INSTALLATION OF MECHANICAL SYSTEM IN CONJUNCTION WITH B01183620-I1
RENOVATION OF EXISTING COMMERCIAL STORE ON 1st FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORK: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. MECHANICAL WORK FOR NEW VENTILATION SYSTEM FOR NAIL STORE IN THE 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRE
INSTALL REPLACEMENT EXTERIOR CHIMNEY AND ROOF MOUNTED DRAFT INDUCER AS PER PLANS. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
INSTALL NEW SPLIT HEAT PUMP SYSTEM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
RENOVATION OF EXISTING COMMERCIAL STORE ON 1st FLOOR WITH GENERAL CONSTRUCTION AND MECHANICAL WORK: INSTALL NEW PARTITIONS, FLOOR/WALL FINISHES. MECHANICAL WORK FOR NEW VENTILATION SYSTEM FOR NAIL STORE IN THE 1ST FLOOR AS PER PLAN. NO CHANGE IN USE, EGRE
HEREWITH FILING MODIFICATIONS TO MECHANICAL SYSTEM AS PER PLANS. NO CHANGE IN USE EGRESS OR OCCUPANCY.
CORRECT OUTDOOR HVAC MODEL SPECIFICATION FILED UNDER PREVIOUS APPLICATION #310291341. NO PROPOSED PHYSICAL WORK ON FIELD. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Replacement of complete existing central heat and air system with or without duct work HVAC Replacement 1 for 1
Replacement of complete existing central heat and air system with or without duct work Install new 3-Ton Carrier Infinity Series 18-SEER2 Variable-Speed Electric AC & Gas Heating System
ePlan: Residential Expedited Review - Addition and Remodel to Existing 1-Story Single Family Res. [4bed 2bath] Work to include: First floor Interior remodel First Floor Addition new bed new bath new office [4bed 3bath].
Dexter 3317 C Left New - 2 Story SFR CONDOMINUM w/ 3 bedrooms 2.5 bathrooms attached 2 car garage covered entry porch and patio FFE: 681.29 Site Plan: SP-2021-0328C Site Plan Exp.: 01/09/27 Max Bld height: 30-0 Actual Bld height: 30-0 required parking: 2.
New construction of single family dwelling with 5 bedrooms and 4.5 baths 3 car garage rear patio and front porch PUD
Replacement of complete existing central heat and air system with or without duct work
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4.5bath] with Habitable Attic Attached Garage/Carport
Replacement of complete existing central heat and air system with or without duct work
New 2-story single family residence 5 bed/5.5 bath attached garage covered porch and patio green building
Fast casual Asian restaurant with mechanical electrical plumbing and finishes work to accommodate restaurant functions. This includes the addition of a grease interceptor and replacement of rooftop equipment but no other exterior work
Phase A of Interior renovation to existing industrial facility for photo metal & etch chemical storage and IMP areas with added new exterior equipment including wet scrubber and emergency generator.
The work is an addition of a second story to an already existing single-family home. A bedroom and bathroom will be added to the second story and the kitchen will be remodeled. The second story will be added on top of the already existing homes footprint and will total 422SF
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAc system through Austin Energys Weatherization Assistance Program.